Open Access. Powered by Scholars. Published by Universities.®
![Digital Commons Network](http://assets.bepress.com/20200205/img/dcn/DCsunburst.png)
Physical Sciences and Mathematics Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Institution
- Keyword
- Publication
- Publication Type
Articles 1 - 2 of 2
Full-Text Articles in Physical Sciences and Mathematics
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix F: Terrestrial Ecosystem Analysis (Supplement), New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project
Construction of the proposed Dickey-Lincoln School Lakes Project in Aroostook County, Maine will result in the isolation of an area of land due to the impoundment behind Dickey Dam. This land area is located between the United States - Canadian border, the Little Black River, the impoundment (elevation = 913 feet), the Big Black River, and the Shields Branch of the Big Black River, and comprises 183,768 acres of land. A previous report (ERT, 1977) determined the forest types within two miles of the impoundment but did not extend to the Canadian border. This report addresses the forest types
Plants As Pumps, E A N Greenwood
Plants As Pumps, E A N Greenwood
Journal of the Department of Agriculture, Western Australia, Series 4
Native species vary greatly in their ability to pump ground water.
CSIRO studies are measuring water use by different plants to plan revegetation strategies.