Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Fresh Water Studies

The University of Southern Mississippi

Series

Mississippi Sound

Publication Year

Articles 1 - 2 of 2

Full-Text Articles in Physical Sciences and Mathematics

Mid-Breton Sediment Diversion (Mbrsd) Assessment – Final Report, Jerry D. Wiggert, Brandy N. Armstrong, M. Kemal Cambazoglu, Sandeep Kalathupurath Kuttan Jan 2022

Mid-Breton Sediment Diversion (Mbrsd) Assessment – Final Report, Jerry D. Wiggert, Brandy N. Armstrong, M. Kemal Cambazoglu, Sandeep Kalathupurath Kuttan

Faculty Publications

The purpose of this project is to provide managers at the Mississippi Department of Marine Resources (MDMR) with the scientific information needed to accurately address public concerns regarding the potential effects of the Louisiana Coastal Master Plan / Coastal Protection and Restoration Authority (CPRA) Mid-Breton Sediment Diversion (MBrSD) on the jurisdictional waters and resources of Mississippi. The stated design purpose of the MBrSD is to reconnect and re-establish the deltaic sediment deposition process between the Mississippi River and the Breton Sound Basin through a diversion that will deliver up to 75,000 cfs of sediment-laden freshwater. The report presented herein provides …


Monitoring 2019 Bonnet Carré Spillway Impacts - Final Report, J. Read Hendon, Jerry D. Wiggert, Jill Hendon Dec 2020

Monitoring 2019 Bonnet Carré Spillway Impacts - Final Report, J. Read Hendon, Jerry D. Wiggert, Jill Hendon

Faculty Publications

Due to the multiple and extended openings of the Bonnet Carré Spillway in 2019, the University of Southern Mississippi (USM) was tasked by the Mississippi Department of Marine Resources to conduct ecological sampling in the Mississippi Sound and adjacent waters. in an effort to better understand the impacts of the extensive freshwater diversion of Bonnet Carré Spillway operations on Mississippi's coastal and marine resources. The period of performance for this project was June 1, 2019, to August 31, 2019. This technical report summarizes the three months of weekly surveys and analyses, over June - August 2019, conducted by the University …