Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 30 of 743

Full-Text Articles in Physical Sciences and Mathematics

Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc. May 2024

Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc. May 2024

Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Apr 2024

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Apr 2024

Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkely Pit Repository Cost Comparison, Josh Bryson Apr 2024

Berkely Pit Repository Cost Comparison, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson Apr 2024

Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson Apr 2024

Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After The Bell Child Care Center, Thomas J. Beckman, Christopher Berg, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott Apr 2024

Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc. Apr 2024

Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm) Apr 2024

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Technical Specifications - Silver Bow Creek Conservation Area - 60% Submittal April 2024, Atlantic Richfield Company Apr 2024

Technical Specifications - Silver Bow Creek Conservation Area - 60% Submittal April 2024, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby Mar 2024

Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group Mar 2024

Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman Mar 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc. Mar 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe Mar 2024

Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman Mar 2024

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby Mar 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe Mar 2024

Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (Erm) Mar 2024

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby Mar 2024

Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.