Economic Analysis Of Flood Detention Storage By Digital Computer, James Ray Villines, L. Douglas James Jan 1968

Economic Analysis Of Flood Detention Storage By Digital Computer, James Ray Villines, L. Douglas James

KWRRI Research Reports

The objective of this study was to develop a digital computer procedure for preliminary analysis of the economic justification of reservoir detention storage for flood control and to present a sample study illustrating its application. A computer program called the University of Kentucky Flood Control Planning Program III was developed and tested on the flood plain of the South Fork of the Licking River in northeastern Kentucky.

Given a specified reservoir site and a downstream flood plain divided into planning units, Program III selects the economically efficient combination of reservoir detention storage and the associated combination of channel improvement, flood …


Economic Analysis Of Alternative Flood Control Measures By Digital Computer, Thomas M. Rachford Jan 1966

Economic Analysis Of Alternative Flood Control Measures By Digital Computer, Thomas M. Rachford

KWRRI Research Reports

The purpose of this project was to develop a digital computer program for selecting the optimum combination of flood proofing, flood-plain land use, channel improvement, and residual flood damage for a given floodplain. Based on economic efficiency, the optimum policy is selected for each planning unit of the total flood-plain for each period of time called a planning stage. The program was written in Fortran IV for the IBM 7040 and the University of Kentucky Computing Center compiler. The program requires about 23,000 words of core storage and about 30 seconds of execution time per planning-unit-stage for typical conditions. The …