Dickey-Lincoln School Lakes Environmental Impact Statement : Supplement To Draft Eis For Transmission Lines Prepared By The Department Of Energy, New England Division, U.S. Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Environmental Impact Statement : Supplement To Draft Eis For Transmission Lines Prepared By The Department Of Energy, New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Consultation and Coordination During Preparation of the DEIS DOE, in developing the scope of work for the Dickey-Lincoln School Lakes transmission study, recognized the need for a great deal of consultation and coordination. Consultation, coordination, and public involvement were integral parts of the study design. As part of this effort, extent of experience in northern New England and location were important factors in selecting consultants for various portions of the study. The System Planning Study (Appendix A), DOE's first project effort, was accomplished in coordination with the electric utilities of the region, specifically NEPLAN, the planning arm of the New …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

This report is in partial fulfillment of the requirement of the National Environmental Policy Act of 1969. It is a study of the existing and proposed land use impacts which would likely occur as a result of construction of the Dickey-Lincoln Transmission Line in con-junction with the Dickey-Lincoln Hydroelectric Project at Lincoln School in Northern Maine. This report is organized and follows basically a topical summary as outlined in the National Environmental Policy Act.


Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy Jan 1978

Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …