Articles 1 - 15 of 15

Full-Text Articles in Law

An Empirical Analysis Of Dod Construction Task Order Performance, Adam B. Teston, Tyler S. Stout Mar 2021

An Empirical Analysis Of Dod Construction Task Order Performance, Adam B. Teston, Tyler S. Stout

Theses and Dissertations

Cost and schedule overrun plague over 50 of all construction projects, engendering diminished available funding that leads to deferred maintenance and impaired award ability for needed projects. Though existing research attempts to identify overruns sources, the results are inconclusive and frequently differ. Accordingly, this research reviews DoD construction contract data from the past ten years to identify the contract attributes of 79,894 projects that correlate with superior performance for use in future project execution. This research starts with creating a database that houses the largest single source of construction contract information. The research then evaluates the data to determine if …


Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr. Apr 2020

Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr.

Faculty Publications

This study uses descriptive and inferential statistics to identify cost growth Analysis of Military Construction of military construction (MILCON) at the programmatic level, while bridging the gap between Selected Acquisition Report (SAR) estimates and actual project costs. Findings of this study aid the cost community with appropriate allocation of resources in developing these estimates. Overall, Major Defense Acquisition Programs (MDAP) appear to experience more negative growth (cost savings) in MILCON estimates on reviewed SARs— typically less than 0.2% of the total program cost. SAR estimates became more accurate from the first to last SAR in comparison to the total MILCON …


A Comparison Of Sbir Investment Methods: Afwerx Vs Legacy, Evan A. Gist Mar 2020

A Comparison Of Sbir Investment Methods: Afwerx Vs Legacy, Evan A. Gist

Theses and Dissertations

The AFWERX Open Topic (AOT) program uses funding from the United States Air Force’s (USAF) Small Business Innovation and Research (SBIR) budget to adapt commercial technology to USAF needs. The AOT approach to small business investment is markedly different from that of legacy SBIR investment methods. This research is a comparison of processes and outcomes for AOT and legacy SBIR. The first axis of comparison is on commercialization rates. Applying a legacy definition of commercialization on a sample of AOT contracts, we found AOT’s commercialization to be 37% (compared to an 8.8% for legacy SBIR). We caveat this finding by …


A Case For Open Mission Systems In Dod Aircraft Avionics, Michael J. Brown, R. David Fass, Jonathan D. Ritschel Jan 2019

A Case For Open Mission Systems In Dod Aircraft Avionics, Michael J. Brown, R. David Fass, Jonathan D. Ritschel

Faculty Publications

The DOD is adopting open mission systems (OMS) as the future in the military aviation environment. OMS proponents promise reduced costs and truncated schedules through increased competition in the marketplace and reduced coding efforts. To the best of our knowledge, no studies have examined the success of these open architectures in the DOD. Therefore, we investigate costs and schedule for a recent DOD avionics OMS demonstration platform in comparison to 13 historically analogous programs.


Likelihood And Cost Impact Of Engineering Change Requirements For Dod Contracts, James C. Ellis, Edward D. White, Jonathan D. Ritschel, Shawn M. Valentine, Brandon Lucas, Ian S. Cordell Apr 2018

Likelihood And Cost Impact Of Engineering Change Requirements For Dod Contracts, James C. Ellis, Edward D. White, Jonathan D. Ritschel, Shawn M. Valentine, Brandon Lucas, Ian S. Cordell

Faculty Publications

Purpose: There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.
Design/Methodology/Approach: Using the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A …


An Analysis Of Major Acquisition Reforms Through Text Mining And Grounded Theory Design, Amanda L. Mcgowin Mar 2018

An Analysis Of Major Acquisition Reforms Through Text Mining And Grounded Theory Design, Amanda L. Mcgowin

Theses and Dissertations

Cost growth is an established phenomenon within Defense Acquisition that the US Government has attempted to abolish for decades through seemingly endless cycles of reform. Dozens of experts and senior leaders within the acquisition community have published their notions on the reasons for cost growth, nevertheless, legislation has yet to eradicate this presumed conundrum. For this reason, this research is aimed at identifying existing trends within past major Defense Acquisition Reform legislation, as well as in a compendium of views from leaders within the Defense Acquisition community on the efficacy of acquisition reform, to determine the possible disconnect. To accomplish …


The Myth Of Strategic And Tactical Airlift, Jacob D. Maywald, Adam D. Reiman, Alan A. Johnson, Robert E. Overstreet Apr 2017

The Myth Of Strategic And Tactical Airlift, Jacob D. Maywald, Adam D. Reiman, Alan A. Johnson, Robert E. Overstreet

Faculty Publications

In the 21st century, our ability to quickly and decisively deliver combat forces and equipment is of the utmost importance in achieving our national security objectives. The swiftness and flexibility of the US Air Force’s mobility airlift fleet is the key to executing a rapid global mobility strategy. The operational effectiveness and efficiency of military air transportation relies on the expertise and intuition of Air Mobility Command’s (AMC) mobility planners. Working in coordination with the United States Transportation Command (USTRANSCOM) and geographic combatant commands (GCC), AMC is responsible for the tasking and tracking of almost 900 daily mobility sorties worldwide. …


Application Of Relational Contracting Methods To Federal Construction Projects, Travis R. Johnson Mar 2011

Application Of Relational Contracting Methods To Federal Construction Projects, Travis R. Johnson

Theses and Dissertations

Relational contracting is a method designed to improve relationships between contracted parties. The federal construction sector was a leader in the development and implementation of an early form of relational contracting known as partnering. Since then, alliancing has emerged as the new evolution of relational contracts. While it provides many potential benefits to contracting parties, alliancing has not yet been utilized in federal construction procurement, which is subject to stringent regulations. A commercially available standard form alliancing contract was selected for analysis against the Federal Acquisition Regulation. Key practices that characterize the alliancing method were identified. Utilizing a panel of …


An Analysis Of Construction Contractor Performance Evaluation System, Rebecca S. Brown Mar 2009

An Analysis Of Construction Contractor Performance Evaluation System, Rebecca S. Brown

Theses and Dissertations

A rigorous system for rating construction contractor performance does not exist for the USAF as identified by the Air Force Civil Engineer (USAF CE), Major General Del Eulberg (Eulberg, 2007). The United States Army Corp of Engineers (USACE) uses DD Form 2626 for contractor performance evaluation and contractor selection. The objective of this research is to strengthen the USAF contractor rating system by exploring USACE‘s use of DD Form 2626. Using data from DD Form 2626, statistical analysis was conducted to determine if the measured performance sub-items reflect their respective performance elements, whether the resulting performance elements relate to the …


Indentifying And Assessing Effective Mechanisms For Technology Transfer, Michael A. Romero Mar 2007

Indentifying And Assessing Effective Mechanisms For Technology Transfer, Michael A. Romero

Theses and Dissertations

The ability to shift knowledge and resources from federal laboratories to industrial and academic partners and vice versa is the primary reason that technology transfer (T2) exists today. Without the cooperation of federal, state, and private agencies working together to resolve today’s technology quandaries, a lot of the breakthroughs experienced today would not exist. This research was focused on uncovering which mechanisms are utilized by scientists and engineers. The research entails uncovering both official and unofficial mechanisms and ascertaining why some methods are preferred over others. It is also a secondary focus, to determine which barriers are impeding …


Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman Mar 2006

Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman

Theses and Dissertations

New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a "risk-based decision" be made to determine if EVM should be used on firm-fixed price contracts under $20 million. Although not previously applicable to Military Construction (MILCON) building projects or other Air Force Civil Engineer (CE) managed contracts, the new threshold requires that CE projects be evaluated for risk. Therefore, the focus of this research was to analyze the risk factors associated with construction contracts in an attempt to build a …


Predicting The Effects Of Contingency Contracting On Local Economies, Donald J. Wagoner Mar 2006

Predicting The Effects Of Contingency Contracting On Local Economies, Donald J. Wagoner

Theses and Dissertations

In recent years, Air Force personnel have been deployed in support of contingency operations to various points on the globe. The Department of Defense spends millions of dollars to support and sustain forces during contingency operations. The Air Force deploys Contingency Contracting Officers (CCO) to support personnel during these operations. During a contingency operation contracting officers will normally establish short-term contracts as quickly as possible to meet mission requirements with little concern for the local economy. This research concluded that the actions of Air Force CCOs can affect the local economy in a deployed location. By providing contingency contracting officers …


An Analysis Of The Acquisition Process For Simplified Acquisition Of Base Engineering Requirements (Saber) Contracts And Its Potential Impact On Contractor Performance, Brian J. Heaps Mar 2001

An Analysis Of The Acquisition Process For Simplified Acquisition Of Base Engineering Requirements (Saber) Contracts And Its Potential Impact On Contractor Performance, Brian J. Heaps

Theses and Dissertations

The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to expedite contract award of civil engineer requirements through the issuance of individual delivery orders. The contract contains a collection of detailed task specifications that include most types of real property maintenance, repair, and construction work. The Assistant Secretary of the Air Force for Acquisition's Operational Contracting Division (SAF/AQCO) identified a number of failed SABER contracts. The problem statement designed for this research effort was: There are a large number of SABER contractors that are failing during the performance period on their SABER contracts. SAF/AQCO is trying to …


Professional Contracting Certification: An Examination And Model Development, Robert D. Lorton, Daniel I. Dunn Sep 1999

Professional Contracting Certification: An Examination And Model Development, Robert D. Lorton, Daniel I. Dunn

Theses and Dissertations

This study compared the elements of existing contracting certification programs to an ideal contracting certification model developed by experts. The expert panel responded to an open-ended electronic interview to convey their ideas regarding the individual elements for the model. Input received from the initial interviews was used to develop a survey for the panel members. The surveys were completed and results were recorded and conveyed back to the panel members. This process was repeated until a majority was reached on each individual element of the model, resulting in the ideal certification model. The final model contained elements of both the …


A Strategy For Combining The Pollution Prevention Opportunity Assessment With The Environmental Compliance Assessment And Management Program, Stacy E. Gent Sep 1993

A Strategy For Combining The Pollution Prevention Opportunity Assessment With The Environmental Compliance Assessment And Management Program, Stacy E. Gent

Theses and Dissertations

This research develops a method to allow an installation environmental function to satisfy the assessment requirements of both the Air Force Pollution Prevention and the Environmental Compliance Assessment and Management Program with the implementation of one assessment process. The model developed is designed to achieve the goals of both programs while increasing the efficiency of implementation. The resulting assessment model formulated within this research is applied on a theoretical level to yield preliminary results. These results indicate that the combination of the Pollution Prevention Opportunity Assessment and the environmental compliance assessment required by the Environmental Compliance Assessment and Management Program …