Articles 1 - 6 of 6

Full-Text Articles in Law

An Empirical Analysis Of Dod Construction Task Order Performance, Adam B. Teston, Tyler S. Stout Mar 2021

An Empirical Analysis Of Dod Construction Task Order Performance, Adam B. Teston, Tyler S. Stout

Theses and Dissertations

Cost and schedule overrun plague over 50 of all construction projects, engendering diminished available funding that leads to deferred maintenance and impaired award ability for needed projects. Though existing research attempts to identify overruns sources, the results are inconclusive and frequently differ. Accordingly, this research reviews DoD construction contract data from the past ten years to identify the contract attributes of 79,894 projects that correlate with superior performance for use in future project execution. This research starts with creating a database that houses the largest single source of construction contract information. The research then evaluates the data to determine if …


Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr. Apr 2020

Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr.

Faculty Publications

This study uses descriptive and inferential statistics to identify cost growth Analysis of Military Construction of military construction (MILCON) at the programmatic level, while bridging the gap between Selected Acquisition Report (SAR) estimates and actual project costs. Findings of this study aid the cost community with appropriate allocation of resources in developing these estimates. Overall, Major Defense Acquisition Programs (MDAP) appear to experience more negative growth (cost savings) in MILCON estimates on reviewed SARs— typically less than 0.2% of the total program cost. SAR estimates became more accurate from the first to last SAR in comparison to the total MILCON …


Application Of Relational Contracting Methods To Federal Construction Projects, Travis R. Johnson Mar 2011

Application Of Relational Contracting Methods To Federal Construction Projects, Travis R. Johnson

Theses and Dissertations

Relational contracting is a method designed to improve relationships between contracted parties. The federal construction sector was a leader in the development and implementation of an early form of relational contracting known as partnering. Since then, alliancing has emerged as the new evolution of relational contracts. While it provides many potential benefits to contracting parties, alliancing has not yet been utilized in federal construction procurement, which is subject to stringent regulations. A commercially available standard form alliancing contract was selected for analysis against the Federal Acquisition Regulation. Key practices that characterize the alliancing method were identified. Utilizing a panel of …


An Analysis Of Construction Contractor Performance Evaluation System, Rebecca S. Brown Mar 2009

An Analysis Of Construction Contractor Performance Evaluation System, Rebecca S. Brown

Theses and Dissertations

A rigorous system for rating construction contractor performance does not exist for the USAF as identified by the Air Force Civil Engineer (USAF CE), Major General Del Eulberg (Eulberg, 2007). The United States Army Corp of Engineers (USACE) uses DD Form 2626 for contractor performance evaluation and contractor selection. The objective of this research is to strengthen the USAF contractor rating system by exploring USACE‘s use of DD Form 2626. Using data from DD Form 2626, statistical analysis was conducted to determine if the measured performance sub-items reflect their respective performance elements, whether the resulting performance elements relate to the …


Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman Mar 2006

Risk-Based Decision Model For Determining The Applicability Of An Earned Value Management System In Construction, Mark D. Workman

Theses and Dissertations

New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a "risk-based decision" be made to determine if EVM should be used on firm-fixed price contracts under $20 million. Although not previously applicable to Military Construction (MILCON) building projects or other Air Force Civil Engineer (CE) managed contracts, the new threshold requires that CE projects be evaluated for risk. Therefore, the focus of this research was to analyze the risk factors associated with construction contracts in an attempt to build a …


A Strategy For Combining The Pollution Prevention Opportunity Assessment With The Environmental Compliance Assessment And Management Program, Stacy E. Gent Sep 1993

A Strategy For Combining The Pollution Prevention Opportunity Assessment With The Environmental Compliance Assessment And Management Program, Stacy E. Gent

Theses and Dissertations

This research develops a method to allow an installation environmental function to satisfy the assessment requirements of both the Air Force Pollution Prevention and the Environmental Compliance Assessment and Management Program with the implementation of one assessment process. The model developed is designed to achieve the goals of both programs while increasing the efficiency of implementation. The resulting assessment model formulated within this research is applied on a theoretical level to yield preliminary results. These results indicate that the combination of the Pollution Prevention Opportunity Assessment and the environmental compliance assessment required by the Environmental Compliance Assessment and Management Program …