Open Access. Powered by Scholars. Published by Universities.®

Other Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Other Engineering

Cable Time Estimation Database, Joshua L. Okerman Jun 2010

Cable Time Estimation Database, Joshua L. Okerman

Industrial and Manufacturing Engineering

The use of time standards are the basis for a high efficiency system in the manufacturing environment. This project will investigate the process followed to design and develop a database used to calculate accurate cable assembly time standards used for scheduling at General Atomics. This project will then justify the use of the Cable Time Estimation Database, through an economic analysis compared to the current methods applied.


Police Operations Simulation, Robert Mcgee Jun 2010

Police Operations Simulation, Robert Mcgee

Industrial and Manufacturing Engineering

In this report, the author explains the process of creating the Police Operations Simulation, shows step-by-step how it works, and statistically analyzes the results from SLOPD’s own proposed and current schedules. The data-gathering from the department and the simulation itself will receive the bulk of the coverage in this report, followed by sample results from SLOPD and a business plan for future sale to other departments.

Using the given numbers, it appears that the proposed schedule will result in significantly improved coverage for the city of San Luis Obispo. While any increase in the number officers on patrol tends to …


Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel Jan 2010

Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel

Industrial and Manufacturing Engineering

The receiving warehouse at Diablo Canyon Power Plant, owned by Pacific Gas and Electric, serves as a place to recognize the receiving of items into an ERP system, repackage and label items for long-term storage, and organize items for delivery inside the secured area. The warehouse managers would like to redesign the layout and procedures of the warehouse. Currently items are not received, scanned, or shipped in a timely manner. The flow of people and items in the receiving and shipping area is chaotic and space is limited especially during plant outages. The objective of this project is to: • …


Environmental Savings Tracking System For Cisco Systems, Inc., Lauren J. Herrera Jan 2010

Environmental Savings Tracking System For Cisco Systems, Inc., Lauren J. Herrera

Industrial and Manufacturing Engineering

This paper illustrates the research, methodology and design used to create an environmental savings tracking system, also known as the Green Dashboard, for Cisco Systems Inc.’s Green Initiatives Group to quantify and capture an annualized summary of savings from projects initiated within its Customer Value Chain Management Organization. It articulately describes the

methodology behind the selection of metrics and the design of the process required to collect and track these quantitative direct savings. As well as describes the benefits associated with implementing this system, such as shifting Cisco towards more sustainable products and increased customer satisfaction and investor relations by …