Fire Protection Engineering: Culminating Experience Project Reports

Theses/Dissertations

2014

Egress

Articles 1 - 4 of 4

Full-Text Articles in Other Engineering

Fire Protection And Life Safety Evaluation- Houston Community College- San Jacinto Building, Will Clay Jun 2014

Fire Protection And Life Safety Evaluation- Houston Community College- San Jacinto Building, Will Clay

Fire Protection Engineering: Culminating Experience Project Reports

This report evaluates the life safety features of the HCC San Jacinto Building (SJB) both prescriptively and on a performance basis. The goal is to present the building code requirements for the HCC San Jacinto building and determine if the design is in compliance, as well as analyze the building on the basis of performance criteria to determine if there are any excessive threats to life safety. The building is designed in compliance with the Houston Building Code, and takes advantage of lesser requirements for existing features. The performance section determines that based on fire and egress modeling, that while …


Fire And Life Safety Analysis- Uw Medicine Lake Union Phase 3.1, Marge Hong Jun 2014

Fire And Life Safety Analysis- Uw Medicine Lake Union Phase 3.1, Marge Hong

Fire Protection Engineering: Culminating Experience Project Reports

This report provides a summary of the fire protection and life safety features for UW Medicine Lake Union, a research and laboratory building, in accordance with Seattle Building Code (SBC), International Building Code (IBC), and Life Safety Code (NFPA 101). The objective of this report is to identify if UW Medicine Lake Union meets both the prescriptive and performance based code. The primary fire safety goal is to provide life safety system that reduced the risk of fire-related injuries and loss of life due to fire. The prescriptive analysis is used to identify the building integrity per code. This evaluates …


Westside Christian High School, Michael Stewart Jun 2014

Westside Christian High School, Michael Stewart

Fire Protection Engineering: Culminating Experience Project Reports

The building I have chosen to use as the model for exemplifying the components of a wet fire suppression system is Westside Christian High School (WCHS). This building completed construction in January of 2014 and is located at: 8200 SW Pfaffle Street Tigard, Oregon 97223. The existing structure was previously owned and occupied by City Bible Church who will now lease space from the High school during and after construction. The renovations include the addition of space for music, art classes, fitness center, gym, science labs, and others. The renovations will also be widening existing rooms and hallways. The core …


Cal Poly Student Recreation Center Fire Protection Review, Alain N. Mamada Jun 2014

Cal Poly Student Recreation Center Fire Protection Review, Alain N. Mamada

Fire Protection Engineering: Culminating Experience Project Reports

This report summarizes the analysis of the existing fire protection features and systems installed in the Recreation Center building on the Cal Poly campus. The analysis is conducted into two different approaches. A prescriptive analysis approach will examine installed fire protection features and systems in accordance with the International Building Code. The analysis will consider the building as existing building as per IBC provisions. A performance-based approach will assess whether the building occupants will egress the building before conditions become untenable. Fire dynamic simulations will be used to determine the available safe egress time and evacuation simulations will performed to …