Open Access. Powered by Scholars. Published by Universities.®

Other Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Industrial Engineering

Production

Articles 1 - 2 of 2

Full-Text Articles in Other Engineering

Product Realization Capstone: Element Proof Safety Steps For Willie Price Lab School, Catherine Thomas, Allan Heuerman, Jared Mumme May 2020

Product Realization Capstone: Element Proof Safety Steps For Willie Price Lab School, Catherine Thomas, Allan Heuerman, Jared Mumme

Honors Theses

The purpose of this document is to describe the process we took to complete our capstone which paired the Center for Manufacturing Excellence with the Willie Price Lab School. The goal of the capstone was to remake step stools for the students of Willie Price, as the last stools failed to withstand weather damage. However, with the COVID-19 pandemic, plans were hindered, shifting the goal from actually producing the steps to creating instructions so that a younger Center for Manufacturing class could complete the production at a later date. Standardized Work Instructions, a detailed production plan, and engineering drawings were …


Interaction Between Primary Resources And Root Causes In Lean Production Systems, Ernest Anene Iwuchukwu May 2011

Interaction Between Primary Resources And Root Causes In Lean Production Systems, Ernest Anene Iwuchukwu

Masters Theses

A model to analyze lean systems reliability is developed based on the premises that lean production systems require four primary resources; materials, equipment, personnel, and schedule (Sawhney, R., Subburaman, K., Sonntag, C., Capizzi, C. and Rao, P.V., 2009). The four primary lean resources were independently analyzed, without due consideration to underlying relationships within each other. In this research, relationships and interaction between root-causes and lean primary resources were conceptualized and developed. The development applied a five-phase approach: 1. review of related literature, 2. decompositions of lean primary resources, 3. selection of consensus root causes items and questionnaire construct, 4. survey …