Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 1 of 1
Full-Text Articles in Mining Engineering
Active Noise Control Of Stageloader Noise In Longwall Mining, Jeremy M. Slagley, Steven Guffey
Active Noise Control Of Stageloader Noise In Longwall Mining, Jeremy M. Slagley, Steven Guffey
Faculty Publications
With the large-scale mechanization inherent to the mining industry, noise-induced hearing loss remains a major concern. As part of on-going efforts to develop engineering controls to reduce noise levels in longwall mining, active noise control experiments were conducted above ground on a modified non-working stageloader. Recorded underground stageloader noise was broadcast into the above ground stageloader. The result was an average 7 dBA reduction when the active noise control was applied. These results suggest the possibility that active noise reduction can be a useful means to reduce stageloader noise if the control system can be made sufficiently rugged. The study …