The Optimization Of Failure Risk Estimation On The Uniform Corrosion Rate With A Non-Linear Function, Fernanda Hartoyo, Jaka Fajar Fatriansyah, Imam Abdillah Mas'ud, Farhan Rama Digita, Hanna Ovelia, Datu Rizal Asral Aug 2022

The Optimization Of Failure Risk Estimation On The Uniform Corrosion Rate With A Non-Linear Function, Fernanda Hartoyo, Jaka Fajar Fatriansyah, Imam Abdillah Mas'ud, Farhan Rama Digita, Hanna Ovelia, Datu Rizal Asral

Journal of Materials Exploration and Findings

Failures in the oil and gas pipeline system are conditions that must be avoided and anticipated because the losses due to the failures can occur at a very high level. Internal corrosion is one of the significant causes of the failures in pipeline systems. In addition, this type of corrosion is due to the high content of carbon dioxide and other corrosive substances in crude oil and natural gas. Therefore, an optimal inspection scheduling system is required to prevent the possibility of pipeline failures due to corrosion and to avoid any overspending on the budget due to excessive inspection scheduling. …


Applications Of Simulation And Optimization Techniques In Optimizing Room And Pillar Mining Systems, Angelina Konadu Anani Jan 2016

Applications Of Simulation And Optimization Techniques In Optimizing Room And Pillar Mining Systems, Angelina Konadu Anani

Doctoral Dissertations

"The goal of this research was to apply simulation and optimization techniques in solving mine design and production sequencing problems in room and pillar mines (R&P). The specific objectives were to: (1) apply Discrete Event Simulation (DES) to determine the optimal width of coal R&P panels under specific mining conditions; (2) investigate if the shuttle car fleet size used to mine a particular panel width is optimal in different segments of the panel; (3) test the hypothesis that binary integer linear programming (BILP) can be used to account for mining risk in R&P long range mine production sequencing; and (4) …