Railway Bridges Up-To-Date, Stephen Dick Mar 2020

Railway Bridges Up-To-Date, Stephen Dick

Purdue Road School

Railroad bridges are not foremost on people’s minds, but they are still a critical item in our nation’s infrastructure. The railroads have a major investment in their bridges, and with many beyond 100 years old, maintenance and replacement of them is still a major cost item. This presentation describes the current state of railroad bridges, discusses older and new bridges, and addresses the current regulatory environment.


Waterproofing Membrane For Concrete Boxes And Culverts, Keith Alan Lytton P.E., Jeremy Hunter P.E. Mar 2020

Waterproofing Membrane For Concrete Boxes And Culverts, Keith Alan Lytton P.E., Jeremy Hunter P.E.

Purdue Road School

In 2019 a new INDOT Specification went into effect for waterproofing on concrete pipes and three- and four-sided boxes. The new specification decreased the leakage at these structures joints from 95% to less than 5%. This presentation will provide the background on why the change was needed and the solution, complete with construction examples and results.


Bim For Bridges And Structures Pooled Fund Initiative, Julie Rivera, Connor Christian Mar 2020

Bim For Bridges And Structures Pooled Fund Initiative, Julie Rivera, Connor Christian

Purdue Road School

The BIM for Bridges and Structures initiative, also known as TPF-5(372), is a transportation pooled fund project that is a collaborative effort of 20 states, FHWA, and the AASHTO Committee on Bridges and Structures. The pooled fund objective is to develop an open, national standard for exchanging information necessary for the design, fabrication, and construction of bridges and structures in the United States. The presentation will provide an overview of the project and explain ways in which stakeholders can get involved.


A Look At Indot's Overhead Sign Structures, David Boruff Mar 2020

A Look At Indot's Overhead Sign Structures, David Boruff

Purdue Road School

This presentation highlights results of sign sheeting field review and associated changes in policy and standards, as well as how we’re implementing the findings from our overhead sign structure inspection program through the first statewide overhead sign structure repair and replacement contract.


Load Rating Of Bridges Without Plans, Rafael Armendariz, Mark Bowman Mar 2020

Load Rating Of Bridges Without Plans, Rafael Armendariz, Mark Bowman

Purdue Road School

The presentation will address the challenges of load rating bridges without plans and how a four-step procedure can be used to guide the engineer in determining bridge ratings for poorly documented bridges. The procedure is illustrated through the assessment of an earth-en-filled reinforced concrete arch bridge with no available bridge information.