Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 3 of 3
Full-Text Articles in Engineering
Transportation Safety Performance Of Us Bus Transit Agencies And Population Density: A Cross-Sectional Analysis (2008-2014), Ilker Karaca, Peter T. Savolainen
Transportation Safety Performance Of Us Bus Transit Agencies And Population Density: A Cross-Sectional Analysis (2008-2014), Ilker Karaca, Peter T. Savolainen
Ilker Karaca
The paper examines the transportation safety performance of transit agencies providing public bus service in the US by using data from the National Transit Database (NTD)
Uses NTD data for a seven-year period from 2008 to 2014 • 3,853 observations for 651 public transportation agencies in 50 states
Seven types of bus transit fatalities and injuries (including passengers, operators, pedestrians, bicyclists)
Main explanatory variable: urban density obtained from the US Census figures
Other explanatory variables: total agency revenue miles, unlinked passenger trips, agency fleet size, and urban population
Nchrp Synthesis 499: Alternate Design/Alternate Bid Process For Pavement-Type Selection. A Synthesis Of Highway Practice, Douglas D. Gransberg, Ashley F. Buss, Ilker Karaca, Michael C. Loulakis
Nchrp Synthesis 499: Alternate Design/Alternate Bid Process For Pavement-Type Selection. A Synthesis Of Highway Practice, Douglas D. Gransberg, Ashley F. Buss, Ilker Karaca, Michael C. Loulakis
Ilker Karaca
Highway administrators, engineers, and researchers often face problems for which information already exists, either in documented form or as undocumented experience and practice. This information may be fragmented, scattered, and unevaluated. As a consequence, full knowledge of what has been learned about a problem may not be brought to bear on its solution. Costly research findings may go unused, valuable experience may be overlooked, and due consideration may not be given to recommended practices for solving or alleviating the problem. There is information on nearly every subject of concern to highway administrators and engineers. Much of it derives from research …
Valuation Of Flexibility And Investment Timing In Airport Infrastructure Projects: Cases In Airport Expansions And Alternate Design Alternate Bid Bidding, Ilker Karaca
Ilker Karaca
Many large infrastructure projects are subject to considerable uncertainty over their revenue streams which makes their valuations particularly challenging. When project scalability can be altered as new information is revealed over the course of a project’s lifecycle, the presence of uncertainty can, in fact, provide option values that are ignored with static Net Present Value (NPV) analyses. To achieve these benefits, however, a better understanding of volatility is of the essence. This dissertation seeks to demonstrate how a better understanding of the business risks could facilitate the valuation of flexibility options in investment timing and engineering design. It also details …