Field Monitoring Of A Tieback Wall And Comparison To Common Design Methods, Matheus Barbosa Santos De Miranda Jul 2019

Field Monitoring Of A Tieback Wall And Comparison To Common Design Methods, Matheus Barbosa Santos De Miranda

Graduate Theses - Civil Engineering

This thesis presents the monitoring of a 28-foot high retaining wall located on the Rose- Hulman Institute of Technology (RHIT) campus and compares inclinometer and load cell data with common design methods. In addition, it briefly provides discussion regarding how the retaining structure is used to enhance student learning. The wall consists of soldier piles and wood lagging with tiebacks that vary from 22.5 to 40 feet. Construction was completed in 2017. Instrumentation, including load cell and inclinometers were installed to measure deflection, tieback load, and water level. This thesis describes the construction activities and the data gathered to date. …


Behavior Of Geothermal Energy Piles Embedded In Rock, Ehab Sabi Apr 2019

Behavior Of Geothermal Energy Piles Embedded In Rock, Ehab Sabi

Civil and Environmental Engineering Theses and Dissertations

Geothermal energy piles are categorized as closed systems. Energy piles are a relatively new technology which couples the structural role of traditional pile foundations to that of heat exchangers to fulfill the required energy demand of buildings and infrastructures. These foundations are equipped with pipes embedded in the concrete forming the pile. While connected to a heat pump, the fluid circulating inside these pipes provides the exchange of heat with the ground for heating and cooling purposes. As the undisturbed temperature at the shallower depths of the ground stays comparatively constant the whole year, being warmer than the surrounding temperature …


Investigation Of Dredge Material Dewatering Through Hydraulic And Ground Improvement Methods, Monica Moody Jan 2019

Investigation Of Dredge Material Dewatering Through Hydraulic And Ground Improvement Methods, Monica Moody

Williams Honors College, Honors Research Projects

Every year almost 1.5 million tons of material is dredged from Lake Erie to allow passage for boat traffic. In the past, this material has been placed back into the open waters of the lake. However, starting July 2020 this will no long be permitted due to the passing of Senate Bill 1. Therefore, secondary uses of this dredging material are being investigated. To be used, the material needs to be quickly dewatered and stabilized. This project consists of literary reviews of two methods of rapid dewatering, hydraulic placement and ground improvement methods. Hydraulic placement dewatering requires the use of …