Transportation Research Center: Public Perception of Midwest Pavements

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Public Perceptions Of The Midwest’S Pavements - Wisconsin - Phase Iii (Final Report), Marquette University, Department Of Civil, Construction, And Environmental Engineering Sep 2000

Public Perceptions Of The Midwest’S Pavements - Wisconsin - Phase Iii (Final Report), Marquette University, Department Of Civil, Construction, And Environmental Engineering

Transportation Research Center: Public Perception of Midwest Pavements

The stratified sample furnished by WisDOT and the participants recruited by the WSRL provided a sample adequate for purposes of fulfilling the objectives of Phase III. The sample as furnished by the DOT was skewed towards better pavement quality based on PDI. However, the sample based on IRI was skewed toward poorer quality pavements. The team believes this shows a balanced sample, and the differences in pavement quality between the two indices are the result of the IRI boundaries for the categories. The categories in the two indices should be in closer agreement, although they measure different characteristics.

Overall, the …


Public Perceptions Of The Midwest’S Pavements - Introduction, David Kuemmel Jan 2000

Public Perceptions Of The Midwest’S Pavements - Introduction, David Kuemmel

Transportation Research Center: Public Perception of Midwest Pavements

The “Public Perceptions of the Midwest’s Pavements” is the largest survey of public perceptions of satisfaction and improvement policies on rural, two-lane highways ever conducted in the 20th Century in the USA. The project was a Pooled Fund effort undertaken by the Wisconsin DOT and included equal participation of the Iowa and Minnesota DOTs. Approximately 4500 drivers and over 1000 highway segments were surveyed in the three states in all three phases of the project, between 1996 and 2000.

The surveys included improvement policy and construction alternative issues and trade-offs, as well as surveys of beliefs and attitudes of the …