Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 1 of 1
Full-Text Articles in Engineering
Two-Tier Partially Enclosed Air-Cure Tobacco Barn, George A. Duncan
Two-Tier Partially Enclosed Air-Cure Tobacco Barn, George A. Duncan
Agricultural Engineering Extension Publications
With the rising costs, scarcity of materials, and greater construction requirements for regular tobacco barns, the concept of a lower cost but functionally sound tobacco curing facility with partial or no sidewall closure has been developed into a blueprint plan shown in Figure 1. The plan can be built and used now with partial sidewalls and enclosed more completely later if desired.