Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Theses/Dissertations

Western Michigan University

Civil Engineering

Accelerated bridge construction

Articles 1 - 1 of 1

Full-Text Articles in Engineering

Developing Standard Procedures For Structural Aspects Of Slide-In Bridges In Accelerated Bridge Construction (Abc), Ozan Utku Ridvanoglu Apr 2016

Developing Standard Procedures For Structural Aspects Of Slide-In Bridges In Accelerated Bridge Construction (Abc), Ozan Utku Ridvanoglu

Masters Theses

Slide-in bridge construction (SIBC) is a special method especially used to replace an existing bridge with the minimum duration road closure. In this method, new bridge superstructure is built next to the existing one and it is slid to its final position after demolishing the existing one. Applied implementations of SIBC show that several complications are experienced during bridge slide related with surface interaction. There is a need to evaluate the structural components of SIBC to develop suggestions. In this research, structural components of SIBC were investigated. The research dealt with completed SIBC implementations and numerical modelling of the slide …