Articles 1 - 4 of 4

Full-Text Articles in Engineering

Large-Scale Non-Linear Dynamic Optimization For Combining Applications Of Optimal Scheduling And Control, Logan Daniel Beal Dec 2018

Large-Scale Non-Linear Dynamic Optimization For Combining Applications Of Optimal Scheduling And Control, Logan Daniel Beal

Theses and Dissertations

Optimization has enabled automated applications in chemical manufacturing such as advanced control and scheduling. These applications have demonstrated enormous benefit over the last few decades and continue to be researched and refined. However, these applications have been developed separately with uncoordinated objectives. This dissertation investigates the unification of scheduling and control optimization schemes. The current practice is compared to early-concept, light integrations, and deeper integrations. This quantitative comparison of economic impacts encourages further investigation and tighter integration. A novel approach combines scheduling and control into a single application that can be used online. This approach implements the discrete-time paradigm from …


Methods To Support The Project Selection Problem With Non-Linear Portfolio Objectives, Time Sensitive Objectives, Time Sensitive Resource Constraints, And Modeling Inadequacies, Neil C. Ranly Sep 2018

Methods To Support The Project Selection Problem With Non-Linear Portfolio Objectives, Time Sensitive Objectives, Time Sensitive Resource Constraints, And Modeling Inadequacies, Neil C. Ranly

Theses and Dissertations

The United States Air Force relies upon information production activities to gain insight regarding uncertainties affecting important system configuration and in-mission task execution decisions. Constrained resources that prevent the fulfillment of every information production request, multiple information requestors holding different temporal-sensitive objectives, non-constant marginal value preferences, and information-product aging factors that affect the value-of-information complicate the management of these activities. This dissertation reviews project selection research related to these issues and presents novel methods to address these complications. Quantitative experimentation results demonstrate these methods’ significance.


The Developmental Test Scheduling Problem, Joseph E. Schoenbeck Mar 2018

The Developmental Test Scheduling Problem, Joseph E. Schoenbeck

Theses and Dissertations

Developmental testing of aircraft systems in the United States Air Force requires a complex set of resources for each test. The optimal scheduling of those resources is the job of the 412th Test Wing at Edwards Air Force Base. With more than 20 different Combined Task Forces requesting resources for roughly 300 flying missions each week, manual scheduling is a difficult task. The current process takes a team of schedulers several days to get a workable result from which they can start tailoring the final schedule. While concepts and techniques can be taken from industry scheduling problems, the body of …


Impact Of Critical Path Method (Cpm) Of Scheduling On On-Time Completion Of Transportation Projects, Fahim Ahmed Jan 2018

Impact Of Critical Path Method (Cpm) Of Scheduling On On-Time Completion Of Transportation Projects, Fahim Ahmed

Theses and Dissertations

This study addresses the effectiveness of Critical Path Method (CPM) scheduling on project delivery. Specifically, the on-time completion of projects with and without a CPM schedule is explored. The paper uses data from 2,097 South Carolina transportation projects let after February 2008 and substantially completed by August 2015. The delay analysis uses the original contract completion date as well as the completion date adjusted by change orders. Chi-Squared tests are used to examine the relationship between CPM scheduled projects and delayed projects, and t-tests are used to compare the mean delay (in days) between CPM scheduled and unscheduled projects. The …