Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Dehumidification Water Quality Analysis Of The South Texas Gulf Of Mexico, Erik Esteban Castillo May 2019

Dehumidification Water Quality Analysis Of The South Texas Gulf Of Mexico, Erik Esteban Castillo

Theses and Dissertations

This project is to introduce a new methodology for environmental research that analyzes humidity from a water treatment perspective. This is done by using a household dehumidifier, which extracts the excess humidity in a given space, to harvest the samples. The dehumidifier was used outside to act as an Atmospheric Water Generator (AWG), which is the process of extracting water from the atmosphere. When AWG is placed near shoreline, then it's classified as a Desalinated Atmospheric Water Generator (DAWG) since it extracts distilled seawater water-vapors. The methodology for DAWG analyzed turbidity in the humidity on SPI, indicating to meet {<.15} TCEQ turbidity water quality standard. The turbidity also showed to have an adverse relation to weather conditions. There is an open market in research on this topic, where the methodology for DAWG can offer answers. This project identifies DAWG as being a sustainable source of potable water for a municipality.


Investigation Of Distributed Model Predictive Control For Economic Load Shifting In Building Hvac Systems, Peter Kinsella May 2015

Investigation Of Distributed Model Predictive Control For Economic Load Shifting In Building Hvac Systems, Peter Kinsella

Theses and Dissertations

One of the major challenges that building owners and operators face is maintaining a low cost of operation. In certain markets within the U.S., electrical cost varies throughout the day; it is higher during times of peak demand. This leaves the customer the incentive to cut back electrical use during peak demand periods. Since 40% of the peak electrical demand is due to the operation of the building HVAC system alone, the opportunity exists for shifting the building cooling load to off-peak hours. This can be done by pre-cooling the space, thereby using the building mass as a sort of …