Contract Time Optimization Methodologies For Highway Construction Projects, Yi Jiang, Huaxin Chen Nov 2009

Contract Time Optimization Methodologies For Highway Construction Projects, Yi Jiang, Huaxin Chen

JTRP Technical Reports

This study was conducted to develop methodologies for appropriately determining the monetary values of I/D rates of highway construction projects in Indiana. In this study, a comprehensive literature review was performed to identify possible effective methodologies for work zone effects, construction impacts, and contract time optimization. The highway production rates were developed in a previous study. The production rates were validated and adjusted with the help from INDOT field engineers. The weighin- motion (WIM) collected traffic data were obtained, processed, and analyzed to provide input data for user cost calculations at highway work zones. Construction data were obtained and processed …


Construction Costs - Using Federal Vs. Local Funds, Varun Kishore, Dulcy M. Abraham Jul 2009

Construction Costs - Using Federal Vs. Local Funds, Varun Kishore, Dulcy M. Abraham

JTRP Technical Reports

Costs of highway construction projects have been rising with rising prices of construction materials such as asphalt, concrete and steel. Identifying cost saving strategies is one of the ways of efficient utilization of available funds (federal and local) by the state Department of Transportations (DOTs) and Local Public Agencies (LPAs). A case study comprising of a sample pair of projects (a federal-aid project and a 100% locally funded project) constructed in Elkhart County, Indiana was undertaken to compare construction costs when sources of funding vary. Based on analysis of cost details from these two projects and discussions with the general …


Determination Of Ash Mixture Properties And Construction Of Test Embankment - Part B, Sungmin Yoon, Umashankar Balunaini, Monica Prezzi, Rodrigo Salgado, Nayyar Zia Siddiki Jan 2006

Determination Of Ash Mixture Properties And Construction Of Test Embankment - Part B, Sungmin Yoon, Umashankar Balunaini, Monica Prezzi, Rodrigo Salgado, Nayyar Zia Siddiki

JTRP Technical Reports

Class F fly ash and bottom ash are solid residue byproducts produced by coal-burning plants. They are usually disposed off with a typical disposal rate of 80 % fly ash and 20 % bottom ash. To maximize the use of the coal ash, and thus significantly reduce the disposal problem that electric utility companies and our society in general face, the direct use of ponded or landfilled ash that is composed of high proportions of fly ash would be desirable. However, a general understanding of the behavior of high volume fly ash mixtures is needed. Although there have been investigations …


Determination Of Indot Highway Construction Production Rates And Estimation Of Contract Times, Yi Jiang, Hongbo Wu Jan 2004

Determination Of Indot Highway Construction Production Rates And Estimation Of Contract Times, Yi Jiang, Hongbo Wu

JTRP Technical Reports

The duration of a highway construction project depends primarily on the quantity or magnitude of the construction work and the productivity of the construction crew. In addition, many other factors may also affect the construction duration, such as the type of construction, traffic features, location (urban or rural site), and weather conditions. When a state highway construction project contract is bid, a reasonable time must set and specified in the contract documents for completion of the contracted project. The time for contract completion (often called “contract time”) is estimated based on the average completion times of individual construction items within …


Development And Application Of Linear Scheduling Techniques To Highway Construction Projects, D. J. Harmelink, Rene Antonio Yamin Jan 2001

Development And Application Of Linear Scheduling Techniques To Highway Construction Projects, D. J. Harmelink, Rene Antonio Yamin

JTRP Technical Reports

Crucial to the successful outcome of major highway construction and reconstruction projects today is the ability to accurately plan, predict and control the construction process. Evermore sensitive to budget control, schedule control, resource allocation and impacts on the motoring public, highway constructors today require sophisticated project management tools to achieve project goals. One of the tools recently being used across the country is project scheduling. The use of scheduling techniques on highway projects has grown out of the successful application of these methods to building construction for the past 20 to 30 years. Unfortunately, the effective application of traditional scheduling …


Identification And Quantification Of Radionuclides In Coal Ash, James E. Alleman, Franklyn M. Clikeman, Thomas Skronski Jan 1998

Identification And Quantification Of Radionuclides In Coal Ash, James E. Alleman, Franklyn M. Clikeman, Thomas Skronski

JTRP Technical Reports

One of the important environmental issues raised recently in regard to coal ash reuse for highway construction purposes (e.g., embankment development) is that of worker, and public, exposure to radiation which might possibly be emitted by these types of residuals. Radiation emission is, in fact, a natural phenomenon for most materials, both natural and man-made, but in the case of coal ash residuals the process of combustion produces an inevitable concentration of radionuclides from the original virgin coal. INDOT’s corresponding environmental concern consequently focuses on the following basic question: does this magnification of radionuclides found within these coal ash residuals …


Environmental Bioassay Evaluation Of Foundry Waste Residuals, Kenneth Chad Bastian, James E. Alleman Jan 1996

Environmental Bioassay Evaluation Of Foundry Waste Residuals, Kenneth Chad Bastian, James E. Alleman

JTRP Technical Reports

Although the constructive reuse of foundry residuals represents a decidedly beneficial goal with distinct economic and environmental benefits, potential end-users are nonetheless reluctant to use these residuals, given an inherent concern about potential unforeseen environmental liabilities. Results of foundry residual leachate characterization to date strongly suggest that many ferrous foundries are discarding sands whose quality is fully amenable to their future use with embankment construction and related high-volume highway development activities. In order to provide additional assurance as to the environmental impact of foundry residual reuse, the MicrotoxTM bioassay has been used to quantify the response of living organisms (e.g., …