Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 3 of 3
Full-Text Articles in Engineering
Modification Of Flow Model And Optimal Pumping Strategies For Capturing Tce And Dce Plumes Near Mission Drive, Wurtsmith Air Force Base, Michigan: Feasibility Study, Alaa H. Aly, Richard C. Peralta
Modification Of Flow Model And Optimal Pumping Strategies For Capturing Tce And Dce Plumes Near Mission Drive, Wurtsmith Air Force Base, Michigan: Feasibility Study, Alaa H. Aly, Richard C. Peralta
Civil and Environmental Engineering Faculty Publications
Utah State University (USU) and Parsons Engineering Science (PES) were tasked by the Air Force Center for Environmental Excellence to:
( 1) Modify the three-dimensional basewide ground-water flow model for Wurtsmith Air Force Base (WAFS), Michigan (PES, 1997) based on recent investigation by ICF Kaiser (ICF).
(2) Develop contaminant transport models for OT-24 area TCE and DCE plumes. These models will use the same parameters that were used by ICF in their feasibility study ..
(3) Use the flow and transport models to develop optimal pumping strategies to achieve cleanup and capture of the plumes
1997 Calibration Of Flow Model And Optimal Pumping Strategies To Capture Tce Plume At Travis Afb, Ca, Richard C. Peralta, A. H. Aly, J. Atkinson, J. Williams
1997 Calibration Of Flow Model And Optimal Pumping Strategies To Capture Tce Plume At Travis Afb, Ca, Richard C. Peralta, A. H. Aly, J. Atkinson, J. Williams
Civil and Environmental Engineering Faculty Publications
The objective of this study was to develop a ground-water model that can be used in conjunction with an optimization model to optimize the containment and remediation of ground water contaminated with organic compounds at Travis AFB, California (TAFB). Based on studies by WESTON (Roy F. Weston, Inc.), RADIAN (Radian Corporation), and others, the major ground-water quality problem is a plume of TCE that originates at the Oil Spill Area (OSA) and bas migrated to the south and east under the runway. The immediate remediation objective is to stop the movement of the plume.
Feasibility Considerations Of An Optimal Pumping Strategy To Capture Tce/Pce Plume At March Afb, Ca, Mohamed A. Hegazy, Richard C. Peralta
Feasibility Considerations Of An Optimal Pumping Strategy To Capture Tce/Pce Plume At March Afb, Ca, Mohamed A. Hegazy, Richard C. Peralta
Civil and Environmental Engineering Faculty Publications
TCE/PCE contaminated groundwater from March AFB has reached off-base supply wells. Further migration of the contaminants can endanger other downstream water supply wells.