Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering Faculty Publications

1996

Balanced

Articles 1 - 1 of 1

Full-Text Articles in Engineering

Toward A Balanced Strategy To Address Contaminated Groundwater Plumes At The Massachusetts Military Reservation, Richard C. Peralta May 1996

Toward A Balanced Strategy To Address Contaminated Groundwater Plumes At The Massachusetts Military Reservation, Richard C. Peralta

Civil and Environmental Engineering Faculty Publications

This document contains the findings and recommendations of the Technical Review and Evaluation Team (TRET) for the plume containment project at the Massachusetts Military Reservation (MMR). The findings and recommendations are in response to the 60 Percent Plume Containment Design, submitted by Operational Technologies (OpTech) in January 1996. In short, the TRET recommends the MMR depart substantially from the strategy of simultaneous, 100 percent containment and treatment that was assigned to OpTech for design in accordance with the Record of Decision (ROD) for Interim Action. This strategy guided the course of the plume containment project over the past two years