Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Western University

2012

IEC 61850

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Security Aspects Of Smart Grid Communication, Pubudu E. Weerathunga Aug 2012

Security Aspects Of Smart Grid Communication, Pubudu E. Weerathunga

Electronic Thesis and Dissertation Repository

As the grid becomes highly interconnected, power protection, control, and monitoring in transmission and distribution substations are increasingly relying on digital controls and digital communication. Rapid penetrations of communication into power grid, and growing concerns about cyber security have attracted significant attention towards smart grid cyber security. Cyber security in the smart grid must be carefully designed to meet power system operation’s functional and reliability requirements.

This thesis discusses issues related to the security of power system communication and their counter measures. It focuses on development of security mechanisms for secure substation communication, and analyzes the impact of security overhead …


Investigation Of Wireless Lan For Iec 61850 Based Smart Distribution Substations, Palak P. Parikh Aug 2012

Investigation Of Wireless Lan For Iec 61850 Based Smart Distribution Substations, Palak P. Parikh

Electronic Thesis and Dissertation Repository

The IEC 61850 standard is receiving acceptance worldwide to deploy Ethernet Local Area Networks (LANs) for electrical substations in a smart grid environment. With the recent growth in wireless communication technologies, wireless Ethernet or Wireless LAN (WLAN), standardized in IEEE 802.11, is gaining interest in the power industry for substation automation applications, especially at the distribution level. Low Voltage (LV) / Medium Voltage (MV) distribution substations have comparatively low time-critical performance requirements. At the same time, expensive but high data-rate fiber-based Ethernet networks may not be a feasible solution for the MV/LV distribution network. Extensive work is carried out to …