Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

University of Nevada, Las Vegas

Publications (WR)

Civil and Environmental Engineering

Water currents

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Evaluation Of Impacts Associated With Reregulation Of Water Levels In Lake Mohave, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service Mar 1980

Evaluation Of Impacts Associated With Reregulation Of Water Levels In Lake Mohave, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service

Publications (WR)

The U.S. Water and Power Resources Service is considering reregulating Lake Mohave water levels to increase the net power benefit from Hoover Dam. Reregulation will not increase the generation capacity of the Hoover powerplant but it will enable the plant operation to be increased when the energy has greater monetary value. Energy generated at different times of the year has different market value, the highest being in January-March and July- September. By generating more power during these periods more net monetary benefit can be derived from Hoover Dam. The total volume of water released from Hoover Dam over an annual …


Evaluation Of Possible Temperature Fluctuations From Proposed Power Modifications At Hoover Dam, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service Mar 1980

Evaluation Of Possible Temperature Fluctuations From Proposed Power Modifications At Hoover Dam, Larry J. Paulson, John R. Baker, U.S. Water And Power Resources Service

Publications (WR)

There are several planned alternatives for increasing the generation capacity of Hoover Dam to help meet peak power demands. These alternatives include: (a) uprating the existing generating units, (b) replacing or adding one or more generating units and (c) adding reversible pumped-storage hydroelectric units. Since the existing generators are at the end of their economic life and have to be replaced, their uprating has been scheduled as routine maintenance. This will increase the generating capacity of the Hoover Dam powerplant from 1240 MW to 1810 MW, but the anticipated capacity for meeting power demand is 2300 MW. Therefore, modifications (alternatives …