Bulbous Pier: Alternative To Bridge Pier Extensions, Amilcar Chavez May 2015

Bulbous Pier: Alternative To Bridge Pier Extensions, Amilcar Chavez

UNLV Theses, Dissertations, Professional Papers, and Capstones

Bridge deck splashing causes deterioration to the bridge structure and renders the bridge unsafe for motorist and pedestrians. The traditional countermeasure for bridge deck splashing is pier extension, the pier extension moves the pier wave away from the bridge deck, but retrofitting existing bridges with pier extensions is costly. This research proposes the bulbous pier concept as an alternative to pier extension.

The decrease in the pier wave produced by the bulb is due to energy subtracted by the bulb via two forces, the viscous resistance, and the wave-making resistance. The proposed mathematical model for the bulbous pier design follows …


Investigation Of Chloride Induced Corrosion Of Bridge Pier And Life-Cycle Repair Cost Analysis Using Fiber Reinforced Polymer Composites, Dinesh Dhakal Dec 2014

Investigation Of Chloride Induced Corrosion Of Bridge Pier And Life-Cycle Repair Cost Analysis Using Fiber Reinforced Polymer Composites, Dinesh Dhakal

UNLV Theses, Dissertations, Professional Papers, and Capstones

Bridges are the long term investment of the highway agencies. To maintain the required service level throughout the life of a bridge, a series of maintenance, repair, and rehabilitation (MR&R) works can be performed. To investigate the corrosion deterioration and maintenance and repair practices in the bridge pier columns constructed in chloride-laden environment, a questionnaire survey was conducted within the 50 state Departments of Transportation (DOTs). Based on the survey data, two corrosion deterioration phases were identified. They were corrosion crack initiation phase and corrosion propagation phase. The data showed that the mean corrosion crack initiation phase for bridge pier …