Flow Shop Scheduling Problem: A Computational Study, Amr Arisha, Paul Young, Mohie El Baradie Jan 2002

Flow Shop Scheduling Problem: A Computational Study, Amr Arisha, Paul Young, Mohie El Baradie

Conference papers

A computational study has been developed to obtain optimal / near optimal solution for the flow shop scheduling problem with make-span minimization as the primary criterion and the minimization of either the mean completion time, total waiting time or total idle time as the secondary criterion. The objective is to determine a sequence of operations in which to process ‘n’ jobs on ‘m’ machines in same order (flow shop environment) where skipping is allowed. The Simulation approach for deterministic and stochastic flow shop scheduling has been developed. It reads and manipulates data for 500 jobs on 500 machines. Different factorial …


Critical Loading Events For The Assessment Of Medium Span Bridges, Colin C. Caprani, S. A. Grave, E. J. O'Brien, A. J. O'Connor Jan 2002

Critical Loading Events For The Assessment Of Medium Span Bridges, Colin C. Caprani, S. A. Grave, E. J. O'Brien, A. J. O'Connor

Conference papers

This paper describes the simulation of free-flowing traffic across bridges to predict the characteristic values for bridge load effects such as bending moment and shear force. The results of these simulations are then used to demonstrate that, in predicting the characteristic extreme load effects to which a bridge may be subjected, it is not sufficient to solely model one-or two-truck presence events. It is shown that loading events involving three or more trucks may need be included in the model for short to medium spans. The critical loading events for a particular load effect are strongly dependent on the span …