Pend Oreille River, Box Canyon Model: Model Scenario Simulations, Chris Berger, Robert Leslie Annear, Scott A. Wells Jul 2007

Pend Oreille River, Box Canyon Model: Model Scenario Simulations, Chris Berger, Robert Leslie Annear, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The Washington Department of Ecology is interested in developing a temperature Total Maximum Daily Load (TMDL) allocation for the Pend Oreille River between the Albeni Falls Dam (U.S. Army Corps of Engineer’s reservoir) and Box Canyon Dam as shown in Figure 1. The Pend Oreille drainage basin is shown in Figure 2. An existing model of the Box Canyon reach was updated from CE-QUALW2 Version 3.0 to Version 3.5. This current research involves improving the calibration of the original model (1997 and 1998) and expanding the model using 2004 as an additional data set for calibration.

The use of field …


Idaho Pend Oreille River Model: Model Development And Calibration, Robert Leslie Annear, Chris Berger, Scott A. Wells Nov 2006

Idaho Pend Oreille River Model: Model Development And Calibration, Robert Leslie Annear, Chris Berger, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The objectives of this project were to:

• Develop a hydrodynamic and temperature model of Pend Oreille River using CE-QUAL-W2 Version 3.2

• Calibrate the CE-QUAL-W2 model to field data collected during 2004 and 2005 using the following water quality variables:

  • flow, water surface elevation, and velocity
  • temperature o dissolved oxygen
  • nutrients (NO3-N+NO2-N, NH4-N, PO4-P)
  • algae – chlorophyll a
  • BOD5 and dissolved organic matter and particulate organic matter compartments (both labile and refractory) for the organic matter cycling with algae
  • periphyton

The model chosen for development was CE-QUAL-W2 Version 3.2 (Cole and Wells, 2004). This is a two-dimensional unsteady hydrodynamic …


Pend Oreille River, Box Canyon Model: Model Development And Calibration, Robert Leslie Annear, Chris Berger, Scott A. Wells Nov 2006

Pend Oreille River, Box Canyon Model: Model Development And Calibration, Robert Leslie Annear, Chris Berger, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The purpose of this study was to improve the existing Version 3.0 application of CE-QUAL-W2 of the Pend Oreille River between Box Canyon Dam and Albeni Falls Dam by performing the tasks outlined above. In addition, the use of field data from 2004 as an additional calibration year would improve the confidence in the model’s predictive ability for temperature. The model simulations were run from January 1st to December 31st in each of the 3 years of model simulation: 1997, 1998 and 2004.

The model chosen for development is CE-QUAL-W2 Version 3.5 (Cole and Wells, 2006). This is a twodimensional …


Green River Ce-Qual-W2 Project: A Hydrodynamic And Water Quality Study Of The Green River King County, Washington, Tim Kraft, Robert Leslie Annear, Chris Berger, Scott A. Wells Jul 2004

Green River Ce-Qual-W2 Project: A Hydrodynamic And Water Quality Study Of The Green River King County, Washington, Tim Kraft, Robert Leslie Annear, Chris Berger, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

This report describes the data processing and model calibration performed for a hydrodynamic and water quality model of the Green River, located in King County, Washington. Figure 1 shows the location of the river, and the limits of the section of river that was modeled.

The Green River flows from its headwaters in the Cascade Mountain foothills through the King County, Washington communities of Auburn, Kent, and Tukwila before discharging into the Duwamish River. Two sections of the river were modeled in this project. The Middle Green River begins in the Cascade Mountain foothills east of Tacoma, and continues downstream …


Upper Spokane River Model: Model Calibration, 2001, Chris Berger, Robert Leslie Annear, Benjamin Welle Jan 2003

Upper Spokane River Model: Model Calibration, 2001, Chris Berger, Robert Leslie Annear, Benjamin Welle

Civil and Environmental Engineering Faculty Publications and Presentations

The Upper Spokane River system under consideration is located in the Northeastern part of Washington State and runs from the Stateline with Idaho, River mile (RM) 96.0, downstream to Long Lake dam at RM 32.5. Figure 1 shows the river system and an outline the boundaries of the City of Spokane.

The Washington Department of Ecology (Ecology) is interested in a water quality model for the Upper Spokane River system for use in developing Total Maximum Daily Loads (TMDLs). As a result, Ecology and the Corps of Engineers funded a study to develop a water quality and hydrodynamic model of …


Upper Spokane River Model: Boundary Conditions And Model Setup, 2001, Spencer Slominski, Robert Leslie Annear, Chris Berger, Scott A. Wells Dec 2002

Upper Spokane River Model: Boundary Conditions And Model Setup, 2001, Spencer Slominski, Robert Leslie Annear, Chris Berger, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The Washington Department of Ecology is interested in a water quality model for the Upper Spokane River system for use in developing Total Maximum Daily Loads (TMDLs). The goals of this modeling effort are to:

• Gather data to construct a computer simulation model of the Spokane River system including Long Lake Reservoir and the pools behind Nine Mile dam, Upper Falls dam and Upriver dam for 2001 based on the calibration conducted for 1991 and 2000 data sets, (Annear et al, 2001).

• Ensure that the model accurately represents the system hydrodynamics and water quality (flow, temperature, dissolved oxygen …


Upper Spokane River Model: Model Calibration, 1991 And 2000, Chris Berger, Robert Leslie Annear, Scott A. Wells Jan 2002

Upper Spokane River Model: Model Calibration, 1991 And 2000, Chris Berger, Robert Leslie Annear, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The Washington Department of Ecology is interested in a water quality model for the Upper Spokane River system for use in developing Total Maximum Daily Loads (TMDLs). The goals of this modeling effort are to:

• Gather data to construct a computer simulation model of the Spokane River system including Long Lake Reservoir and the pools behind Nine Mile dam, Upper Falls dam and Upriver dam. • Ensure that the model accurately represents the system hydrodynamics and water quality (flow, temperature, dissolved oxygen and nutrient dynamics)

This report evaluates the model calibration and discusses issues relative to that calibration effort. …


Lower Willamette River Model: Model Calibration, Chris Berger, Robert Leslie Annear, Scott A. Wells Dec 2001

Lower Willamette River Model: Model Calibration, Chris Berger, Robert Leslie Annear, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

Water Environment Services of Clackamas County is in the process of planning upgrades on several of its wastewater treatment plants (WWTPs) which discharge into the Lower Willamette River. The goals of the modeling effort were to:

• Gather data to construct a computer simulation model of the Lower Willamette River system in order to evaluate the impact of the WWTP discharges on water quality

• Ensure that the model accurately represents the system physics and chemistry (flow, temperature, dissolved oxygen and nutrient dynamics) by model calibration

• Use the model to evaluate how to meet various future discharge scenarios for …


Lower Willamette River Model: Boundary Conditions And Model Setup, Herman G. Rodriguez, Robert Leslie Annear, Scott A. Wells, Chris Berger Nov 2001

Lower Willamette River Model: Boundary Conditions And Model Setup, Herman G. Rodriguez, Robert Leslie Annear, Scott A. Wells, Chris Berger

Civil and Environmental Engineering Faculty Publications and Presentations

Water Environment Services of Clackamas County is in the process of planning upgrades on several of its sewage treatment plants which discharge into the Lower Willamette River. The goals of the modeling effort are to:

• Gather data to construct a computer simulation model of the Lower Willamette River system including part of the Lower Columbia River and the Willamette River above the Oregon City Falls; Because of the tidal influence in the Lower Willamette River, portions of the Columbia River that might affect the Lower Willamette River water quality were also modeled. Also, a section of the Willamette River …


Upper Spokane River Model: Boundary Conditions And Model Setup, 1991 And 2000, Robert Leslie Annear, Chris Berger, Scott A. Wells Nov 2001

Upper Spokane River Model: Boundary Conditions And Model Setup, 1991 And 2000, Robert Leslie Annear, Chris Berger, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The Washington Department of Ecology is interested in a water quality model for the Upper Spokane River system for use in developing Total Maximum Daily Loads (TMDLs). The goals of this modeling effort are to:

• Gather data to construct a computer simulation model of the Spokane River system including Long Lake Reservoir and the pools behind Nine Mile dam, Upper Falls dam and Upriver dam

• Ensure that the model accurately represents the system hydrodynamics and water quality (flow, temperature, dissolved oxygen and nutrient dynamics)

A hydrodynamic and water quality model, CE-QUAL-W2 Version 3 (Wells, 1997), is being applied …