Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

City University of New York (CUNY)

Series

Publications and Research

Civil Engineering

Sustainability

Publication Year
File Type

Articles 1 - 4 of 4

Full-Text Articles in Engineering

The Living Breakwaters Pdr Efforts Econcrete Resource Analysis, Guianina Ferrari, Shervon Stephens, Calvin O. Walters Jr. Dec 2022

The Living Breakwaters Pdr Efforts Econcrete Resource Analysis, Guianina Ferrari, Shervon Stephens, Calvin O. Walters Jr.

Publications and Research

On October 29, 2012, Superstorm Sandy impacted 443,000 people and caused nearly $19 billion (about $58 per person in the US) worth of damage within New York City. As part of the New York City infrastructure reparation plan, the Living Breakwaters project in Tottenville addressed coastal resilience, allocating $100M of public funds to a series of artificial breakwaters by the southwest coast of Staten Island. Each breakwater is constructed and designed to mitigate water flow in storm events. ECOncrete, a primary element of the breakwater, is a specialty cast cementitious product that is marine organism-friendly that encourages biocalcification and photosynthesis. …


The Living Breakwaters Pdr Efforts: Conceptual Scheduling, Calvin O. Walters Jr. May 2022

The Living Breakwaters Pdr Efforts: Conceptual Scheduling, Calvin O. Walters Jr.

Publications and Research

On October 29, 2012, Superstorm Sandy caused nearly $19 billion in damages in New York City including 69,000 residential units across the five boroughs. This disaster precipitated a post-disaster-rebuilding (PDR) project including roughly $4.2 billion in a Community Development Block Grant allocated towards PDR projects. A portion of the grant was used to construct a living breakwater in Tottenville, Staten Island, consisting of a resiliency approach to risk reduction through erosion prevention, wave energy attenuation, and enhancement of ecosystems and social resiliency to improve resistance to storms for the community of Tottenville. The ridges of each breakwater are designed with …


Benefits Of Pre-Construction Analysis: Cet Senior Capstone Expands Understanding Of An Urban Refuge At Gallopnyc Sunrise Stables, Aalaa Mohammed Dec 2020

Benefits Of Pre-Construction Analysis: Cet Senior Capstone Expands Understanding Of An Urban Refuge At Gallopnyc Sunrise Stables, Aalaa Mohammed

Publications and Research

For any construction project, there exists a phase of planning known as “pre-construction.” This initial phase of the project provides a definition of the project, identification of potential issues, planning and scheduling, scope, cost estimation, and analysis of needs for the job. My research analyzes a pre-construction case study conducted for Gallop NYC’s Stable in Howard Beach, Queens. The findings suggest that the practice of construction planning is effective in order to avoid delays in construction itself and ensure successful project completion. Supporting literature examines some of the best practices for pre-construction analysis. These include but are not limited to: …


Solar And Rain Catching Canopy. Urban Oasis, Afolabi Ibitoye, Langston Clark, Elena Zimareva, Evan Banks, Alexander Aptekar May 2018

Solar And Rain Catching Canopy. Urban Oasis, Afolabi Ibitoye, Langston Clark, Elena Zimareva, Evan Banks, Alexander Aptekar

Publications and Research

The Urban Oasis is designed to work within existing “pocket parks” in New York City as a combined rainwater collector, personal electronics charging station and resting designation for New Yorkers. Intended to not only lessen the demand on the city power grid by using renewable energy to charge devices, the urban oasis is also intended to mitigate grey water overfill in New York’s combined sewer system and, in general, serve as a model for responsible environmental stewardship in urban areas.

The important technical aspects of the canopy specifically analyzed were:

a) how much rainwater could the canopy be expected to …