Gis-Based Irrigation District Flow Routing/Scheduling, Charles M. Burt, Beau Freeman Jan 2011

Gis-Based Irrigation District Flow Routing/Scheduling, Charles M. Burt, Beau Freeman

BioResource and Agricultural Engineering

In 2007, the Irrigation Training and Research Center (ITRC) at California Polytechnic State University, San Luis Obispo undertook to develop a prototype of an intelligent and scalable real-time GIS-based water scheduling and routing software system for irrigation districts, capable of integrating multiple data sources into an information access and management facility featuring collaborative tools with automatic reasoning and analytical capabilities. Improving the infrastructure and management capabilities of irrigation districts in order to provide flexible delivery schedules and increase participation in peak demand reduction programs has been identified as having a significant potential to achieve energy conservation and resource efficiencies.

The …


In-House Development Of Scheduling Decision Support Systems: Case Study For Scheduling Semiconductor Device Test Operations, Tali Freed, K. H. Doerr, T. Chang Nov 2007

In-House Development Of Scheduling Decision Support Systems: Case Study For Scheduling Semiconductor Device Test Operations, Tali Freed, K. H. Doerr, T. Chang

Industrial and Manufacturing Engineering

Most manufacturing processes can benefit from an automated scheduling system. However;: the design of a fast, computerised scheduling system that achieves high-quality results and requires minimal resources is a difficult undertaking. Efficient .. scheduling of a semiconductor device test facility requires an information system that provides good schedules quickly. Semiconductor device testing-is the last stage of the long semiconductor manufacturing process, and therefore. is subjected to customer service pressures. The cost of an off-the-shelf computerised scheduling system may he prohibitive for many companies. In addition, many companies are taken aback by other characteristics of off-the-shelf scheduling systems, such as code …


Guidelines For Establishing Irrigation Scheduling Policies, Charles M. Burt Sep 1995

Guidelines For Establishing Irrigation Scheduling Policies, Charles M. Burt

BioResource and Agricultural Engineering

Successful on-farm irrigation scheduling requires that water delivery projects adopt a service concept, and that water deliveries be made with a high degree of reliability. An arranged delivery schedule and seasonal volumetric allocations are additional requirements. Until these conditions are met, attempts to implement modern on-farm irrigation scheduling techniques to maximize water use efficiency, and to maximize yields will be only partially successful.


Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon Oct 1993

Set-Up Saving Schemes For Printed Circuit Boards Assembly, Oded Z. Maimon, Ezey M. Dar-El, Tali F. Carmon

Industrial and Manufacturing Engineering

Focusing on a basic printed circuit board (PCB) assembly line configuration characterized by very long set-up times, we examine two scheduling methods that can significantly reduce the set-up. Both methods -the Grouped Set-Up (GSU) method that has been recently introduced in the literature and the Sequence Dependent Scheduling (SDS) method, which has not been studied in this context -are based on component commonality among PCB types. Using the typical traditional scheduling method as a benchmark, the GSU and the SDS methods are compared in terms of three performance measures: line throughput, average work-in-process (WIP) inventory level, and implementation complexity. Guidelines …


Proposed Scheduling Methods For Printed Circuit Board Assembly, Tali Freed, Ezey M. Dar-El, Oded Z. Maimon Jan 1988

Proposed Scheduling Methods For Printed Circuit Board Assembly, Tali Freed, Ezey M. Dar-El, Oded Z. Maimon

Industrial and Manufacturing Engineering

The current practice in the assembly of electronic components on printed circuit boards (PCB's) is serial production, a process characterized by very long set-up times.

However. with the advent of efficient on-line process information, new production control methods are now possible. This paper proposes two new production methods - the Grouped Set-up (GSU) method and the Sequence-Dependent Scheduling (SDS) method, which can significantly reduce set-up times.

It is shown that the GSU always performs better than the SDS method in terms of total production flow (throughput). while the SDS performs better than the GSU method in terms of work-in-process (WIP) …