Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 8 of 8

Full-Text Articles in Engineering

Semi-Automated Glass Mat Splice Operation For Asphalt Shingle Line, Justin Bracci, Harry Zhao, Chad Linafelter Dec 2014

Semi-Automated Glass Mat Splice Operation For Asphalt Shingle Line, Justin Bracci, Harry Zhao, Chad Linafelter

Mechanical Engineering

The following report details the senior project sponsored by GAF Materials Corporation, Shafter, CA in regards to semi-automating a glass-mat splicing table for asphalt roofing shingle production. Herein includes details, research, design, and analysis regarding the semi-automation of the gluing processes for the splicing table. A working prototype was manufactured and tested for the future implementation onto GAF’s production line or further senior project involvement.


Wingtip Dynamics Simulator, Eugene Fox, Nick Rodriguez, Steven Rieber Dec 2014

Wingtip Dynamics Simulator, Eugene Fox, Nick Rodriguez, Steven Rieber

Mechanical Engineering

Raytheon is a defense contracting company with an electronic warfare division that is developing a radio frequency signal triangulation system. Part of the focus in improving this technology is the need for accurate and real time locational knowledge of the signal receivers, which are located at the tips of aircraft wings. Due to turbulence during flight, the fluttering motion of the wings alter the distance and angle relationships of the two receivers and add noise to the received signal data, which negatively affect the triangulation estimates. To mitigate this error caused by the wing flutter, Raytheon is developing a software …


Electric Porsche Drivetrain Re-Design, Taylor Carlson, Quinton Petty, Spencer Treffry Dec 2014

Electric Porsche Drivetrain Re-Design, Taylor Carlson, Quinton Petty, Spencer Treffry

Mechanical Engineering

The objective of this project was to redesign the drivetrain of the electric 1977 Porsche 911 Targa S with the goal of optimizing the drivetrain for motor efficiency and performance. The focus was to redesign the interface between the electric motor and rear wheels to maximize the efficiency of power transmission from the motor to the ground.

Two systems were proposed, a fixed gear reduction and two motors with an electronic differential. The fixed gear reduction was chosen to be designed and built by replacing the stock Porsche transmission with a differential featuring a favorable gear ratio for the electric …


Team Nathan Suspension, Frankie J. Wiggins, Alex D. Seitz, Justin P. Bautista Oct 2014

Team Nathan Suspension, Frankie J. Wiggins, Alex D. Seitz, Justin P. Bautista

Mechanical Engineering

Nathan Cooper is an 8-year old boy with Spinal Muscular Atrophy (SMA). SMA has affected Nathan’s muscle development and requires him to use the Standing Dani™ mobility device. The Standing Dani is a motorized standing wheelchair, or Wheelstand. Nathan controls and uses it to get around. Though the Standing Dani performs well for most functions, it has some distinct issues. The primary issue that this project addresses is its lack of suspension and the discomfort that Nathan feels as a result. After talking with our client, we developed several specifications generally related to geometry, safety, vehicle dynamics, and reliability. Many …


Automated Foosball Table, Jim R. Stefani, Alex J. Herpy, Brett Gordon Jaeger, Kevin S. Haydon, Derek Alan Hamel Jun 2014

Automated Foosball Table, Jim R. Stefani, Alex J. Herpy, Brett Gordon Jaeger, Kevin S. Haydon, Derek Alan Hamel

Mechanical Engineering

This project is the second iteration of an automated foosball table for Yaskawa America as a trade show display. The table is meant to provide an interactive experience which highlights the speed and precision of the Yaskawa hardware. The first iteration of the project was mainly focused on creating the physical hardware for the system and to begin the basic programming for the system. This phase of the project was focused on finalizing the physical hardware of the system, implementing the vision system and to continue the basic programing of the system AI. A third team will be assigned to …


Mobile Solar Pv Trainer, Matthew Myers, Matthew Clause, Lawrence Smith Jun 2014

Mobile Solar Pv Trainer, Matthew Myers, Matthew Clause, Lawrence Smith

Mechanical Engineering

The aim of the Mobile Solar PV Trainer Project was to design, construct and test a versatile and robust laboratory training rig for the Cal Poly Electrical Engineering department. This project was inspired by the desire of one or more California Polytechnic State University electrical engineering professors to add laboratory components to two established upper division electrical engineering courses in photovoltaic panels and solar power. This report contains a detailed description of the trainer’s desired specifications, our ideation process, a thorough description of the selected trainer design including part drawings, assembly documentation and a bill of materials as well as …


Friction Test Machine, Kyle Raymon Schless, Lynda Beatriz Tesillo, Mustapha Nadri Jun 2014

Friction Test Machine, Kyle Raymon Schless, Lynda Beatriz Tesillo, Mustapha Nadri

Mechanical Engineering

No abstract provided.


Bellevue-Santa Fe Charter School Solar Panel Project, Dulce Arroyo Martinez, Henrik Lee, Moises Quiroz, Timothy Iafrate May 2014

Bellevue-Santa Fe Charter School Solar Panel Project, Dulce Arroyo Martinez, Henrik Lee, Moises Quiroz, Timothy Iafrate

Mechanical Engineering

This project covers the design, manufacture, and installation of solar panel frames on a charter school in Avila Beach, CA. Through preliminary research regarding important factors (such as solar movement, ideal panel angle, and site-specific factors), a frame that meets the standards set forth in the California Building Codes was designed. After approval by presiding authorities, parts specified in the design were ordered, inspected upon arrival, and manufactured to the design as necessary. Much of the challenge was related to the installation aspect of the project—coordination with the proper authorities and correct submission of applications was integral to the success …