Eagle Medical Tray Denesting & Debris Removal Process, Nicholas Allen Ungefug, Noah Chavez, Susana Shu-Lin Okhuysen, Michael Augustine Pennington Jun 2022

Eagle Medical Tray Denesting & Debris Removal Process, Nicholas Allen Ungefug, Noah Chavez, Susana Shu-Lin Okhuysen, Michael Augustine Pennington

Industrial and Manufacturing Engineering

Eagle Medical Incorporated is a contract medical device packaging and sterilization company. The company purchases thermoformed medical packaging trays, which maintain the sterility of medical devices, from various manufacturers. To ensure packaging quality and to prevent cleanroom contamination, Eagle Medical inspects and sterilizes each blister tray that they order. This process is an essential non-value-added activity that creates a bottleneck. Cleanroom employees must stop packaging medical devices and attend to the processing of blister trays and packaging solutions. The blister trays arrive at Eagle’s facility in nested stacks. Vibration and movement during shipping further compresses the stacks, which makes separation …


Farmbot Trackless Redesign, Cole Thomas, Cailey Kamm, Clayton Alderson, Otto Akerstrom Jun 2018

Farmbot Trackless Redesign, Cole Thomas, Cailey Kamm, Clayton Alderson, Otto Akerstrom

Industrial and Manufacturing Engineering

For this project the team PLANT3D worked along with Rory Aronson and FarmBot to generate a cheaper more user-friendly design for the FarmBot Genesis 1.3. Working with Rory and FarmBot, we as a team generated a list of design requirements and engineering specifications for the project. These requirements centered around creating a more accessible FarmBot model for the average person to be able to purchase and set up with ease. Much of this required taking the existing system and eliminating the most common problem areas. These were the track system, built using 1.5 meter aluminum extrusions and the complex interchangeable …