Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

PDF

University of Central Florida

Series

2011

Energy Efficiency

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Energy Savings And Peak Demand Reduction Of A Seer 21 Heat Pump Vs. A Seer 13 Heat Pump With Attic And Indoor Duct Systems - December 2011, Florida Solar Energy Center, James Cummings Dec 2011

Energy Savings And Peak Demand Reduction Of A Seer 21 Heat Pump Vs. A Seer 13 Heat Pump With Attic And Indoor Duct Systems - December 2011, Florida Solar Energy Center, James Cummings

FSEC Energy Research Center®

Experiments were run in an unoccupied 1600 ft2 house, the Manufactured Housing (MH Lab) at the Florida Solar Energy Center (FSEC), to evaluate the delivered performance as well as the relative performance of a SEER 21 variable capacity heat pump versus a SEER 13 heat pump. The performance was evaluated with two different duct systems: a standard attic duct system and an indoor duct system located in a dropped-ceiling space.


Building America Industrialized Housing Partnership (Baihp Ii)Final Report Budget Periods 1-5, April 1, 2006 - November 30, 2010, Florida Solar Energy Center, Robert Abernethy Mar 2011

Building America Industrialized Housing Partnership (Baihp Ii)Final Report Budget Periods 1-5, April 1, 2006 - November 30, 2010, Florida Solar Energy Center, Robert Abernethy

FSEC Energy Research Center®

This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context.

BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas:

  • Task 1: Building America System Research Management, Documentation and Technical Support
  • Task 2A: Stage G1A: Integrated Solutions for Specific Climate Regions
  • Task …