Evaluation Of Indot Hyperfix Project, Kumares C. Sinha, Bob G. Mccullouch, Darcy M. Bullock, Sravanthi Konduri, Jon D. Fricker, Samuel Labi Jan 2004

Evaluation Of Indot Hyperfix Project, Kumares C. Sinha, Bob G. Mccullouch, Darcy M. Bullock, Sravanthi Konduri, Jon D. Fricker, Samuel Labi

JTRP Technical Reports

In 2003 the Indiana Department of Transportation executed an ambitious interstate reconstruction project in Indianapolis, named Hyperfix. This project completely closed the I-65/70 section during reconstruction, on which approximately 250,000 vehicles travel daily. Due to the scope and risk involved, an extensive amount of planning, coordination, and cooperation occurred. The main section was rebuilt during the total closure phase, which lasted 55 days. The total closure approach had never been performed before by INDOT on such a high volume artery in a downtown metropolitan area. This present study analyzed the project and its impact on the Indianapolis area. The report …