Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

External Link

Surendra M. Gupta

Disassembly-to-order (DTO)

Articles 1 - 1 of 1

Full-Text Articles in Engineering

Calculating Disassembly Yields In A Multi-Criteria Decision Making Environment For A Disassembly To Order System, Surendra Gupta, Prasit Imtanavanich Sep 2010

Calculating Disassembly Yields In A Multi-Criteria Decision Making Environment For A Disassembly To Order System, Surendra Gupta, Prasit Imtanavanich

Surendra M. Gupta

In this paper, we consider the disassembly-to-order (DTO) problem, where a variety of returned products are disassembled to fulfill the demand for specified numbers of components and materials. The objective is to determine the optimal numbers of returned products to disassemble so as to maximize profit and minimize costs. We model the DTO problem using a multi-criteria decision making approach. Since the condition of returned products are unknown, the yields from disassembly are considered to be stochastic. To solve the stochastic problem, we use one of two heuristic approaches (viz., one-to-one approach or one-to-many approach) that convert the problem into …