Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Engineering

Dickey-Lincoln School Lakes Hydroelectric Project : Summary Of Water Quality Factors, New England Division, U.S. Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes Hydroelectric Project : Summary Of Water Quality Factors, New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The prediction of future water quality conditions in and downstream from a proposed impoundment is dependent upon a myriad of physical, chemical and biological phenomena. It is known from limnology (science of lakes) that all physicochemical and biological functions are greatly controlled or influenced by lake hydro-dynamics, lake thermodynamics, and the quality of inflowing water.


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This design memorandum presents the results of several studies undertaken to provide an understanding of present and potential future water quality conditions within and downstream from Dickey and Lincoln School Lakes in accordance with the requirements of ETL 1110-2-1402, dated 12 November 1976. Included are an examination of baseline water quality conditions and the findings of qualitative and quantitative predictive analyses performed to evaluate water quality conditions during all phases of the project's lifetime. This document will also serve as a reference for the water quality portions of the project Environmental Impact Statement.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc Jan 1977

Final Report On The Recreation Plan For Dickey-Lincoln School Lakes Project, Maine : Prepared For The Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. This study develops and evaluates a concept plan for the recreation potential of the Dickey-Lincoln School project and assesses the recreational impact of this recommended concept plan.


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...