Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Engineering

Condition Assessment Of Bridge Decks With Asphalt Overlay, Sepehr Pashoutani, Jinying Zhu Dec 2019

Condition Assessment Of Bridge Decks With Asphalt Overlay, Sepehr Pashoutani, Jinying Zhu

Nebraska Department of Transportation: Research Reports

Ground penetrating RADAR (GPR) is a widely used nondestructive testing (NDT) method for bridge deck evaluation. However, the current GPR signal and data processing software and algorithms are not able to provide comprehensive information about bridge deck condition. Although the original objective of this research project was to develop GPR analysis algorithms for condition assessment of bridge decks with asphalt overlay, the scope of work has been expanded to concrete bridge decks with or without overlays.

In this study, the research team developed a complete GPR analysis procedure that includes the following components: 1) obtain zero-time for GPR reflection at …


Mitigating Reflective Cracking Through The Use Of A Ductile Concrete Interlayer, Qian Zhang, Mohammad Khattak, Adway Das Sep 2019

Mitigating Reflective Cracking Through The Use Of A Ductile Concrete Interlayer, Qian Zhang, Mohammad Khattak, Adway Das

Publications

Reflective cracking is considered one of the most important issues that causes premature deterioration of composite pavements. Many types of mitigation methods have been studied in the past. However, they are either not effective in delaying the reflective cracking, or they only extend the service life by a few years. To address this critical issue and significantly extend the service life of the composite pavement, in this research, a ductile interlayer made of engineered cementitious composites (ECC) was proposed. It was hypothesized that by adding a thin layer of highly ductile ECC material between the existing pavement and overlay, reflective …


34-Inch Tall Three Beam Transition To Concrete Buttress, Scott Rosenbaugh, Wyatt Fallet, Ronald K. Faller, Robert W. Bielenberg, Jennifer Schmidt Mar 2019

34-Inch Tall Three Beam Transition To Concrete Buttress, Scott Rosenbaugh, Wyatt Fallet, Ronald K. Faller, Robert W. Bielenberg, Jennifer Schmidt

Nebraska Department of Transportation: Research Reports

Roadway resurfacing and overlay projects effectively reduce the height of roadside barriers placed adjacent to the roadway, which can negatively affect their crashworthiness. More recently, bridge rails and concrete barriers have been installed with slightly increased heights to account for future overlays. However, adjacent guardrails and approach transitions have not yet been modified to account for overlays. The objective of this project was to develop an increased-height, approach guardrail transition (AGT) to be crashworthy both before and after roadway overlays of up to 3 in. (76 mm).

A 34-in. (864-mm) tall, thrie beam transition was designed such that the system …