Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 2 of 2
Full-Text Articles in Engineering
Housing Prefabrication And Resource Optimization, Megan Scherpereel
Housing Prefabrication And Resource Optimization, Megan Scherpereel
Honors Theses
Enclosure during construction is often time-consuming, expensive, and at the mercy of the weather. By introducing methods for manufacturing prefabricated enclosure components such as wall panels and roof sections, the impact of the three major variables is reduced. Designs for trusses, roof sections, wall sections, and foundations were developed and selected using civil engineering principles; and manufacturing and logistical processes were optimized using engineering and project management skill sets. These multi-disciplinary efforts were combined to create an accessible and versatile set of designs and instructions that can improve the effectiveness of both a skilled and non-skilled volunteer workforce. By creating …
Total Bridge Replacement Of M-13 Over Cheboyganing Creek, Daniel Burns
Total Bridge Replacement Of M-13 Over Cheboyganing Creek, Daniel Burns
Honors Theses
The Michigan Department of Transportation sought a proposal consisting of design and construction engineering services for the total bridge replacement of M-13 over Cheboyganing Creek. The M-13 Bridge Project is located on M-13 over Cheboyganing Creek on the Saginaw River in Portsmouth Township, Bay County, Michigan.
Several components of the existing bridge have been rated in poor or serious condition on the National Bridge Inventory rating scale. A total bridge replacement is required and aligns with MDOT strategies to address critical infrastructure needs in the state as well as the Bay Region's five-year plan for managing bridge and culvert infrastructure. …