Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Analysis Of Usaf Medium And Heavylift Space Launch Mission Reliability Requirements, Arthur R. Dawkins Sep 1998

Analysis Of Usaf Medium And Heavylift Space Launch Mission Reliability Requirements, Arthur R. Dawkins

Theses and Dissertations

The launch services that the USAF procures to carry DOD payloads into orbit are characterized by high risks and high costs. If a launch vehicle experiences a catastrophic failure, the cost of the entire launch vehicle, the launch processing, and the payload are completely lost (often in excess of 1,5 billion dollars.) Despite this enormous risk for the payload customer, and indeed the launch provider, launch success rates around the world are not much above 90 percent. The current USAF medium and heavylift launch systems are often based on technology that is 20 years old and older. Furthermore, little historical …


A Risk Analysis Of Remediation Technologies For A Doe Facility, Helene A. Wilson Mar 1998

A Risk Analysis Of Remediation Technologies For A Doe Facility, Helene A. Wilson

Theses and Dissertations

The Department of Energy is responsible for selecting a remediation technology to clean up the Waste Area Group (WAG) 6 site at the Paducah Gaseous Diffusion Plant (PGDP) in Kentucky. WAG 6 is contaminated with an uncertain amount of trichloroethylene (TCE) and technetium-99 (Tc-99). Selecting a remediation technology involves a certain degree of risk because many of these technologies are new or proven only for a specific type of contaminant or a particular set of site conditions. Differences between contaminant type and site conditions are enough to make the performance of a remediation technology uncertain. This research identifies the technological …