Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 7 of 7

Full-Text Articles in Engineering

Risk Management And Biases In How Drivers Respond To Nuisance Flooding, Saige Hill, Juita-Elena (Wie) Yusuf, Burton St. John Iii, Pragati Rawat, Carol Considine Nov 2021

Risk Management And Biases In How Drivers Respond To Nuisance Flooding, Saige Hill, Juita-Elena (Wie) Yusuf, Burton St. John Iii, Pragati Rawat, Carol Considine

School of Public Service Faculty Publications

Nuisance flooding, or recurrent flooding, occurs during high tide and may be exacerbated when combined with other events such as heavy precipitation, strong winds, or storm surge. Sea level rise has contributed to increased frequency and duration of nuisance flooding in low-lying coastal areas and is causing community-specific impacts such as transportation disruption, road closures, compromises to life and property, overwhelmed storm water systems, and infrastructure damage. This chapter focuses on how drivers respond during nuisance flooding events. Specifically, we discuss how drivers in the Hampton Roads region of southeastern coastal Virginia obtain information about road flooding, how they respond, …


Influence Of The Inherent Safety Principles On Quantitative Risk In Process Industry: Application Of Genetic Algorithm Process Optimization (Gapo), Mehdi Jahangiri, Abolfazl Moghadasi, Mojtaba Kamalinia, Farid Sadeghianjahromi, Sean Banaee Jan 2021

Influence Of The Inherent Safety Principles On Quantitative Risk In Process Industry: Application Of Genetic Algorithm Process Optimization (Gapo), Mehdi Jahangiri, Abolfazl Moghadasi, Mojtaba Kamalinia, Farid Sadeghianjahromi, Sean Banaee

Community & Environmental Health Faculty Publications

Inherent safety (IS) refers to a set of measures that enhance the safety level of processes and equipment, rendering additional equipment and/or add-ons. The early design phase of processes is suited best for implementation of IS strategies as some of such strategies either are impossible to be implemented at the operation phase or substantially increase costs. The purpose of this study is to present a new approach called genetic algorithm process optimization (GAPO), by which processes can be made inherently safer even at the operation phase. This study simulates the IS principle, assessing its impact on quantitative risk and the …


Corps Efforts On Sea Level Rise In Hampton Roads, Greg Steele Oct 2015

Corps Efforts On Sea Level Rise In Hampton Roads, Greg Steele

October 30, 2015: Beyond Toolkits: Adaptation Strategies and Lessons

No abstract provided.


Reducing Coastal Risk – Structural Protection Around Greater New Orleans, Rick Luettich May 2015

Reducing Coastal Risk – Structural Protection Around Greater New Orleans, Rick Luettich

May 22, 2015: Megaproject Protective Structures for Hampton Roads

No abstract provided.


You're Going To Need A Bigger Boat..., Michelle Hamor May 2015

You're Going To Need A Bigger Boat..., Michelle Hamor

May 22, 2015: Megaproject Protective Structures for Hampton Roads

No abstract provided.


Project-Risk Management And Decision Analysis In Maritime Maintenance And Repair, Michael C. Plumb, C. Ariel Pinto, Rafael Landaeta, Resit Unal, Thomas Murphy Jan 2012

Project-Risk Management And Decision Analysis In Maritime Maintenance And Repair, Michael C. Plumb, C. Ariel Pinto, Rafael Landaeta, Resit Unal, Thomas Murphy

Engineering Management & Systems Engineering Faculty Publications

The purpose of this paper is to provide insights regarding the implementation of using Project Risk Management (PRM) and Decision Analysis (DA) in managing projects for complex systems such as maritime vessels. The PRM approach apprehends many forms of risk both internal and external within a given project and assists the manager in determining the level of importance of each individual project phase and component to optimize project success. Ship Maintenance and Repair project decision-making requires that risk management and risk analysis techniques be applied in order to guide management in making better decisions to meet ship service life perspective. …


Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management, C. Ariel Pinto, Michael K. Mcshane, Abhishek S. Pathak Jan 2011

Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management, C. Ariel Pinto, Michael K. Mcshane, Abhishek S. Pathak

Finance Faculty Publications

This article describes the Delayed Bang Approach for determining the value of risk management alternatives in critical infrastructure security. The discussion includes (1) the need for sustainable risk management (2) the importance of time valuation in evaluating competing loss prevention and loss reduction alternatives, (3) the convergence of deterministic engineering economics, survivability analysis, and probabilistic analysis, and (4) hypothetical examples of the Delayed-Bang Approach and significance towards more sustainable risk management.