Open Access. Powered by Scholars. Published by Universities.®
Operations Research, Systems Engineering and Industrial Engineering
Articles 1 - 2 of 2
Full-Text Articles in Engineering
Size And Cost Reduction Of The Antenna 3000, Mario Mignott, Austin Deaver, Josh Madaris
Size And Cost Reduction Of The Antenna 3000, Mario Mignott, Austin Deaver, Josh Madaris
Senior Design Project For Engineers
For our senior design project, we have partnered with Compass Technology Group to improve its Antenna 3000 manufacturing process. The Antenna we are working on is not actually called this, but due to NDA regulations, we will disguise it as the Antenna 3000. This will include finding a way to minimize material costs and labor hours involved to assemble this product together. Our minimum success criteria will be to reduce both the manufacturing time and materials' cost by 20%. Our primary approach to solving this problem will be to implement Lean Six Sigma practices such as the DMAIC principle.
Using …
Kennesaw State University - Maintenance Optimization And Cost Analysis, Mary E. Ogidigben, David T. Murphy, William L. Fowler
Kennesaw State University - Maintenance Optimization And Cost Analysis, Mary E. Ogidigben, David T. Murphy, William L. Fowler
Senior Design Project For Engineers
The Department of Housing and Residence Life was looking for ways to improve the quality of their work while saving costs at the same time. The department allowed the team to look over their work orders where the team noticed over 50% of the work orders were related to room turnover. After this discovery, the team focused all efforts on room turnover and went over the process in detail with management. The team asked to see the standard operating procedure for room turnover and learned that most of the staff did not know they had one.
The team wanted to …