Computer Aided Process Planning System For Generating Alternative Process Plans, Rao T. Gali Aug 1991

Computer Aided Process Planning System For Generating Alternative Process Plans, Rao T. Gali

Masters Theses

Computer Aided Process Planning (CAPP) has a key role in Computer Integrated Manufacturing (CIM) as an interface between design and manufacturing. Current CAPP systems treat process planning as a static function, and always generate the same machine and process combinations. Thus, these CAPP systems are inadequate for advanced manufacturing facilities such as Flexible Manufacturing Systems (FMS). This thesis presents research conducted for the design and development of a CAPP system called Alternative Computer Aided Process Planning (A-CAPP) which generates alternative process plans by interacting with production planning and machine loading functions to satisfy system capacity constraints.

A-CAPP is a variant …


Coordinated Strategic Planning Of Hydroelectric Energy Usage Using Stochastic Dynamic Programming With Decoupled Production Cost Simulation, Duane David Highley Jan 1991

Coordinated Strategic Planning Of Hydroelectric Energy Usage Using Stochastic Dynamic Programming With Decoupled Production Cost Simulation, Duane David Highley

Masters Theses

"The method of Stochastic Dynamic Programming is applied to the problem of Long-term hydrothermal coordination for a five-reservoir system in the Midwest. The model that has been developed will optimize the monthly reservoir elevations to produce the lowest expected energy production cost. The production cost calculations are decoupled from the Dynamic Programming loop, resulting in shorter execution times. Constraints are included for maximum and minimum reservoir elevations, maximum monthly reservoir rise and drop, and maximum and minimum monthly energy production. These constraints help to reduce the state space and shorten execution time. An additional constraint is modeled to control the …