Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering

Technological University Dublin

Simulation

Articles 1 - 14 of 14

Full-Text Articles in Engineering

A Simulation-Based Decision Support System To Model Complex Demand Driven Heathcare Facilities, Amr Arisha, Michael Thorwarth Dec 2012

A Simulation-Based Decision Support System To Model Complex Demand Driven Heathcare Facilities, Amr Arisha, Michael Thorwarth

Conference papers

Simulating healthcare processes is a sophisticated endeavor. Treatment processes and patient arrival patterns differ significantly in their statistical attributes and implicate a high degree of variability. In addition, there are several types of interconnected processes of medical staff involved that accompany a patient’s journey through the healthcare facility. Replicating this behavior with process flow models in a discrete event simulation model is highly complex and therefore difficult to create while maintaining a high degree of precision. A framework is thus introduced which delivers an algorithm that allows to implement Multiple Participant Pathway Modeling (MPPM) under the consideration of Flexible Resource …


Capacity Planning For Elderly Care In Ireland Using Simluation Modeling, Mohamed Ragab, Waleed Abo Hamad, Amr Arisha Nov 2012

Capacity Planning For Elderly Care In Ireland Using Simluation Modeling, Mohamed Ragab, Waleed Abo Hamad, Amr Arisha

Conference papers

Global population aging is creating an immense pressure on healthcare facilities making them unable to cope with the growing demand for elderly healthcare services. Current demand-supply gaps result in prolonged waiting times for patients and substantial cost burdens for healthcare systems due to delayed discharges. This paper describes a project aimed at presenting modeling and simulation to address elderly care pathways within the Irish healthcare sector. The management of frail patients admitted to acute hospitals and the introduction of the new intermediate care beds are alternative interventions that healthcare executives are interested in simulating to examine their impact on the …


Simulation-Based Optimisation Model For The Lean Assessment In Sme: A Case Study, Amr Arisha, Amr Mahfouz, John Shea Dec 2011

Simulation-Based Optimisation Model For The Lean Assessment In Sme: A Case Study, Amr Arisha, Amr Mahfouz, John Shea

Conference papers

Due to their space limitation and small production scale, small and medium enterprises (SME) are vulner-able to rapid changes. Lean principles are considered as effective improvement approach to eliminate sys-tem’s waste and inefficiencies. Although much of the academic materials have addressed the lean practic-es into large, global companies, they can still be adjusted to SMEs. Risks are usually associated with lean implementation process due to the drastic required changes in business policies and operations. Simulation can be successfully used to predict the impact of the proposed changes ahead of the implementation which helps to mitigate risks. Integrating simulation with optimization …


Customer Management Analysis Of Irish Plumbing & Heating Distribution System: A Simulation Study, Amr Arisha, Amr Mahfouz, John Crowe, Finbarr Bennett Aug 2010

Customer Management Analysis Of Irish Plumbing & Heating Distribution System: A Simulation Study, Amr Arisha, Amr Mahfouz, John Crowe, Finbarr Bennett

Conference papers

The sudden burst of the property bubble, coupled with current global economic conditions has resulted in a huge decrease in demand for plumbing and heating fixtures in the Irish construction industry. Moreover, inefficient supply chain management policies have imposed further pressures on companies resulting in more system bottlenecks and unnecessary costs. Inventory management is seen as a functional area that can ease such bottlenecks and in turn increase supply chain efficiency, decrease costs and increase customer satisfaction. The challenge is to predict the balance of on-hand inventory and order quantity to optimise customer satisfaction and minimise inventory cost. It is …


Practical Simulation Application: Evaluation Of Process Control Parameters In Twisted-Pair Cables Manufacturing System, Amr Mahfouz, Said Hassan, Amr Arisha Jan 2010

Practical Simulation Application: Evaluation Of Process Control Parameters In Twisted-Pair Cables Manufacturing System, Amr Mahfouz, Said Hassan, Amr Arisha

Articles

Intensive competition and rapid technology development of Twisted-Pair Cables (TPC) industry have left no room for competing manufacturers to harbour system inefficiencies. TPC are used in various communication and networks hardware applications; their manufacturing facilities face many challenges including various product configurations with different equipment settings, different product flows and Work in Process (WIP) space limitations. The quest for internal efficiency and external effectiveness forces companies to align their internal settings and resources with external requirements/orders, or in different words, significant factors must be set appropriately and identified prior to manufacturing processes. Integrated definition models (IDEF0, IDEF3) in conjunction with …


Simulation Model To Investigate Flexible Workload Management For Healthcare And Servicescape Environment, Michael Thorwarth, Paul Harper, Amr Arisha Dec 2009

Simulation Model To Investigate Flexible Workload Management For Healthcare And Servicescape Environment, Michael Thorwarth, Paul Harper, Amr Arisha

Conference papers

High demand and poor staffing conditions cause avoidable pressure and stress among healthcare personnel which results in burnout symptoms and unplanned absenteeism which are hidden cost drivers. The work environment within an emergency department is commonly arranged in a flexible workload which is highly dynamic and complex for the outside observer. Using detailed simulation modeling within structured modeling methods, a comprehensive model to characterize the nurses' time utilization in such flexible dynamic workload environment was investigated. The results have been used to derive a generalized analytic expression that describes certain settings that lead to an instable queuing system with serious …


Process Modelling Support For The Conceptual Modelling Phase Of A Simulation Project, Cathal Heavey, John Ryan Dec 2006

Process Modelling Support For The Conceptual Modelling Phase Of A Simulation Project, Cathal Heavey, John Ryan

Conference papers

While many developments have taken place around supporting the model coding task of simulation, there are few tools available to assist in the conceptual modelling phase. Several authors have reported the advantages of using process modelling tools in the early phases of a simulation project.

This paper provides an overview of process modelling tools in relation to their support for simulation, categorizing the tools into formal method and descriptive methods. A conclusion from this review is that none of the tools available adequately support the requirements gathering phase of simulation. This is not surprising as none of the process modelling …


Requirements Gathering For Simulation, John Ryan, Cathal Heavey Jan 2006

Requirements Gathering For Simulation, John Ryan, Cathal Heavey

Conference papers

This paper discusses the current shortfalls in support for the pre-coding phases of a discrete event simulation project. The paper then presents a process modelling technique, Simulation Activity Diagrams (SADs), developed to specifically support the initial requirements gathering phases of a simulation project. The paper concludes with an outline of proposed future developments to the modelling technique.


Process Modeling For Simulation, John Ryan, Cathal Heavey Jan 2006

Process Modeling For Simulation, John Ryan, Cathal Heavey

Articles

This paper discusses shortfalls in relation to the requirements gathering phases of simulation. While many developments have taken place around supporting the model coding task of simulation, there are few tools available to assist in the requirements gathering phase. This is surprising as it has been reported by several researchers that the requirements phase can absorb twice as much resources as the coding phase. There are numerous process modeling tools available (over 100) that can and have been used to support the requirements phase of simulation. This paper provides a selective review of some of the most important in relation …


Development Of A Process Modelling System For Simulation, John Ryan Jan 2005

Development Of A Process Modelling System For Simulation, John Ryan

Other resources

This thesis details the development of a process modelling technique to aid a simulation model developer during the requirements gathering and conceptual modelling phases of a simulation project.

There are a number of process modelling techniques available that are capable of being used during such phases of a simulation project, however there is currently a lack of process modelling techniques developed specifically to aid a simulation model developer in capturing, representing and communicating information and systems issues to persons involved in the operation of discrete systems under investigation.

A detailed review of the literature related to techniques capable of supporting …


Intelligent Simulation-Based Lot Scheduling Of Photolithography Toolsets In A Wafer Fabrication Facility, Amr Arisha, Paul Young Dec 2004

Intelligent Simulation-Based Lot Scheduling Of Photolithography Toolsets In A Wafer Fabrication Facility, Amr Arisha, Paul Young

Conference papers

Scheduling of a semiconductor manufacturing facility is one of the most complex tasks encountered. Confronted with a high technology product market, semiconductor manufacturing is increasingly more dynamic and competitive in the introduction of new products in shorter time intervals. Photolithography, being one of the processes repeated often, is a fabrication bottleneck. Lot scheduling within photolithography is a challenging activity where substantial improvements in factory performance can be made. The proposed scheduling methodology integrates two common approaches, simulation and artificial intelligence. Using detailed simulation modeling within a structured modeling method, a comprehensive model to characterize the photolithography process was developed. An …


Evaluation Of Scheduling Strategies On The Performance Of A Flexible Manufacturing Cell:A Simulation Study, Amr Arisha, Paul Young, Mohie El Baradie Jan 2003

Evaluation Of Scheduling Strategies On The Performance Of A Flexible Manufacturing Cell:A Simulation Study, Amr Arisha, Paul Young, Mohie El Baradie

Conference papers

The current trend in semiconductor manufacturing is characterized by expanding product variety, decreasing lead times from order to delivery, exacting standards of quality, and competitive prices. One possible means of achieving this is in the form of increased flexibility. Providing flexibility is typically an expensive proposition so, industrial engineers aim to provide more economic approaches to enable flexible manufacturing cells and related equipment to operate appropriately in an efficient manner. It is essential to characterize these tools in detail before the production plans are finalized. Using state-of-the-art computer simulation, a generic model of photolithography tools has been developed. The model …


Simulation Activity Diagrams, John Ryan, Cathal Heavey Jan 2003

Simulation Activity Diagrams, John Ryan, Cathal Heavey

Conference papers

This paper presents a technique, Simulation Activity Diagrams (SAD), developed to lessen the modelling burden during the initial requirements gathering phases of a simulation project. The technique also allows the capture and visual communication of detailed information, to manufacturing personnel, which may otherwise be lost in detailed programming code.


Flow Shop Scheduling Problem: A Computational Study, Amr Arisha, Paul Young, Mohie El Baradie Jan 2002

Flow Shop Scheduling Problem: A Computational Study, Amr Arisha, Paul Young, Mohie El Baradie

Conference papers

A computational study has been developed to obtain optimal / near optimal solution for the flow shop scheduling problem with make-span minimization as the primary criterion and the minimization of either the mean completion time, total waiting time or total idle time as the secondary criterion. The objective is to determine a sequence of operations in which to process ‘n’ jobs on ‘m’ machines in same order (flow shop environment) where skipping is allowed. The Simulation approach for deterministic and stochastic flow shop scheduling has been developed. It reads and manipulates data for 500 jobs on 500 machines. Different factorial …