Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Hydraulic Engineering

Theses

Municipal water supply | Water-supply | Water-supply -- Management | Water leakage -- Management | Water-supply engineering | Infrastructure (Economics) -- Management

Articles 1 - 1 of 1

Full-Text Articles in Engineering

An Examination Of The Influence Of Pressure Management And Active Leakage Control In Establishing The Economic Level Of Leakage For An Urban Water Operational Area, Mark Callanan Jan 2013

An Examination Of The Influence Of Pressure Management And Active Leakage Control In Establishing The Economic Level Of Leakage For An Urban Water Operational Area, Mark Callanan

Theses

Leakage targets in Ireland are based on the Unaccounted for Water (UFW) performance indicator. This has been set out in the National Water Study published by the Department of Environment, Community and Local Government (DECLG) in 2000. This leakage target performance indicator has been maintained since in all government published reports and guidelines.

The use of this performance indicator has been discouraged by the International Water Association (IWA) and its use has been discontinued by the UK water industry because it can misrepresent the true level of leakage. The IWA recommends the use of the Infrastructure Leakage Index (ILl) as …