Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 2 of 2
Full-Text Articles in Engineering
Safe Yield Comparisons For The 1960’S And 2000’S Drought In The Passaic River Basin, Stephanie R. Santos
Safe Yield Comparisons For The 1960’S And 2000’S Drought In The Passaic River Basin, Stephanie R. Santos
Dissertations
The Passaic River Basin is a complex system of rivers, tributaries, reservoirs, and some of the largest water purveyors in the State of New Jersey. Located in the northeastern part of the State, it drains approximately 800 square miles of water that is used for distribution to the five major purveyors: North Jersey District Water Supply Commission, Passaic Valley Water Commission, Jersey City, Newark, and New Jersey American Water. These purveyors operate under a safe yield, which is defined by the New Jersey Department of Environmental Protection (NJDEP) as the amount of water that should be continuously available should the …
Optimizing Work Zone Schedules Considering Traffic Diversion With Artificial Bee Colony Algorithm, Celina Semaan
Optimizing Work Zone Schedules Considering Traffic Diversion With Artificial Bee Colony Algorithm, Celina Semaan
Dissertations
Highway maintenance activities often decrease roadway capacity and intrude traffic movements. The need to finish the project on time and under a specific budget while minimizing the traffic congestion and complying with the emission standards requires an appropriate work zone schedule optimization. The objective of this research is to improve the efficiency of work zone activities and minimize the total project cost including maintenance, user, and emission cost.
While previous studies investigated the work zone optimization problem, they did not consider the implementation of emission standards nor applied a green diversion strategy. This dissertation analyzes the optimization of work zone …