Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Wrack Lines Volume 19, Number 1, Spring/Summer 2019, Nancy Balcom, Syma Ebbin, David Gregorio, Richard Telford, Judy Benson Jun 2019

Wrack Lines Volume 19, Number 1, Spring/Summer 2019, Nancy Balcom, Syma Ebbin, David Gregorio, Richard Telford, Judy Benson

Wrack Lines

Issue theme is: "Making Connections: As the Climate Changes, People and Nature Intertwine in New Ways." Articles include: "As More Roads Become Rivers, Communities Search for Solutions;" "Solving an Engineering Conundrum: As Coastal Homes Get Elevated, New Research Looks at Whether Vulnerability to Wind Damage Is Increasing;" "Along the Coast, Residents Consider How to Heed Sandy's Warning of What's to Come;" "All Rivers, All Lives Run to the Sea," about the intersection of waterways and the world of nature writer Edwin Way Teale; and "Crosscurrents: Connecticut Sea Grant's Retrospective Exhibition Makes Waves," about reaching new audiences and building bridges with …


Pawnee Dam Inflow Design Flood (Idf) Update And Stage-Frequency Curve Development Using Rmcrfa, Jennifer P. Christensen, Joshua J. Melliger Jan 2019

Pawnee Dam Inflow Design Flood (Idf) Update And Stage-Frequency Curve Development Using Rmcrfa, Jennifer P. Christensen, Joshua J. Melliger

United States Geological Survey: Water Reports and Publications

Pawnee Dam is one of the ten Salt Creek Dams designed and built in the 1960s to mitigate flooding in Lincoln, Nebraska. This short paper illustrates the update of the Pawnee Dam inflow design flood (IDF) through calibration to recent high flow events and the development of its stage-frequency or hydrologic loading curve with the U.S. Army Corps of Engineers’ Risk Management Center Reservoir Frequency Analysis (RMC-RFA) model. The IDF update follows Engineering Regulation 1110-8-2, Inflow Design Flood for Dams and Reservoirs, including unit hydrograph peaking and two antecedent pool elevations. Background information on the original design of the dam …