Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 7 of 7

Full-Text Articles in Engineering

Modeling Plant Uptake Of Metal In Constructed Wetlands Supported By Experimentally Derived Uptake Rates, Michael B. Peake Dec 1996

Modeling Plant Uptake Of Metal In Constructed Wetlands Supported By Experimentally Derived Uptake Rates, Michael B. Peake

Theses and Dissertations

Many communities and Air Force installations are using constructed wetlands to filter trace metals from their stormwater runoff. Constructed wetlands are attractive to industry for runoff mitigation because they are relatively cheap to build and operate and require little or no energy for operation. The purpose of this research project is to develop quantitative concepts for understanding the dynamics of metal uptake in constructed wetland plants by constructing a system dynamics model supported by experimental observation and offer environmental managers a tool to simulate, under a broad range of conditions, long term wetland exposure to stormwater runoff contaminated with trace …


Study Of Desorption Of Contaminant From Synthetic Soil, Kung-Fu Hwang Dec 1996

Study Of Desorption Of Contaminant From Synthetic Soil, Kung-Fu Hwang

Theses and Dissertations

A better understanding of sorption and desorption processes could improve estimates of time and cost required for remedial activities, exposure times and health risk, and bioavailability. Conventional rate-limited sorption models do not accurately define the diffusion domain at the grain scale. Heyse (1994) proposed the multiple sites in series (MSS) model, which allows more general description of the geometry of the sorption domain than the classical spherical or discrete distributions. A version of this model was tested by deVenoge (1996). The model was able to accurately simulate sorption rate data, but could not estimate unique geometry parameters. This research is …


A Comparative Analysis Of Two Alternatives To Chemical Aircraft Paint Stripping, George P. Joyce Ii Dec 1996

A Comparative Analysis Of Two Alternatives To Chemical Aircraft Paint Stripping, George P. Joyce Ii

Theses and Dissertations

The Air Force must periodically strip and paint its aircraft to prevent the damaging effects of corrosion. The paint removal process typically involves the use of toxic chemicals such as methylene chloride which are soon to be banned as a result of impending environmental regulations and increased costs associated with handling and disposing of such material. The Air Force must choose an alternative to methylene chloride chemical stripping which complies with environmental regulations and reduces costs. This thesis compares the life cycle costs and environmental impacts of two alternatives to chemical aircraft stripping. Plastic Media Blasting (PMB) and Modified Medium …


Development Of Synthetic Soils For Sorption Mass Transfer Model Validation, Thomas P. De Venoge Dec 1996

Development Of Synthetic Soils For Sorption Mass Transfer Model Validation, Thomas P. De Venoge

Theses and Dissertations

Existing sorption models often fail to describe grain scale sorption because of an inability to define the diffusion domain. A proposed improved model required testing to determine model validity. The testing method used a synthetic media of known geometry such that the distribution of sorption sites was known. Sorption rate data was obtained using batch experiments with the media. Data was used in comparison against model predicted rates. Fined sorption site distributions were compared to real distributions obtained by controlling sorbent geometries. Comparison determined model performance in fitting known distributions. The focus of this study was to (1) determine what …


Environmental Restoration Project, Peer Review Process Assessment, Paul A. Schantz Dec 1996

Environmental Restoration Project, Peer Review Process Assessment, Paul A. Schantz

Theses and Dissertations

Installation Restoration Program (IRP) projects often cost over $250 thousand, and projects over $1.5 million are common. To ensure these projects are risk based, technically sound, and cost effective, the Air Force instituted a peer review program in 1992. The objective of this research is to describe and analyze the peer review process. Through triangulation of data from interviews, observations, official and academic documents, and surveys, seven constructs were discovered: focus, agenda, facilitator, written preparation, oral presentation, team characteristics, and reviewer characteristics. A questionnaire was used to gather perceptions of peer review effectiveness--the criterion variable--and of the seven constructs. A …


Investigation Of Sorption Mass Transfer Models Using Synthetic Soils, Karla K. Mika Dec 1996

Investigation Of Sorption Mass Transfer Models Using Synthetic Soils, Karla K. Mika

Theses and Dissertations

Grain-scale sorption mass transfer is an important process that must be considered when predicting clean-up time and choosing remediation techniques for subsurface hazardous waste contamination. Rate-limited sorption is responsible for the rebound effect, where remediated groundwater is recontaminated by desorption. Sorbed contaminants are not available for microbial degradation, and the desorption rate may govern the effectiveness of natural attenuation by biodegradation. Grain-scale sorption nonequilibrium is generally attributed to diffusive transport, either in SOM or in mineral micropores. Typically used sorption mass transfer models either fail to reproduce long-term slow desorption (first-order models), or are based on diffusion in assumed (often …


Development Of Site Characterization Simulator Specifications, Jeffrey L. Heiderscheidt Nov 1996

Development Of Site Characterization Simulator Specifications, Jeffrey L. Heiderscheidt

Theses and Dissertations

The purpose of this study was to develop a tool for evaluating data quality when characterizing a potentially contaminated groundwater aquifer, and to provide a basis for developing a simulator to allow environmental managers and engineers to practice and learn about the site characterization process. Specifically, this study characterized the uncertainty, estimation block size, and cost for the various methods of determining the value of each geological, hydrological, and contaminant parameter necessary to characterize a site. Research entailed identifying site characterization objectives and identifying parameters necessary to obtain those objectives. Methods of estimating each parameter were identified, then research was …