Full-Text Articles in Engineering

Analysis Of Transformer Ratings In A Wind Farm Environment, John Mccarthy Oct 2010

Analysis Of Transformer Ratings In A Wind Farm Environment, John Mccarthy

ME in Sustainable Electrical Energy Systems

The grid connection transformer is one of the most expensive components of a wind farm development. If a transformer is under-utilised, this indicates that the initial capital outlay on the transformer was excessive. Overloading can lead to accelerated aging and increased losses. This project will investigate whether it is possible, by understanding the load profiles and stress conditions in a wind farm environment, to overload a transformer above its nameplate rating, thus reducing the capital outlay costs in developing a wind farm. The paper will investigate a specific wind farm overloading scenario and examine whether it is feasible, and financially …


Energy Storage:Maximising Irelands Wind Energy Potential, Damien Kelly Oct 2010

Energy Storage:Maximising Irelands Wind Energy Potential, Damien Kelly

ME in Sustainable Electrical Energy Systems

Ireland plan's to generate up to 40% of its electricity from wind generation by 2020. This thesis outlines the problems that may be faced by the electricity system and illustrates the benefits that large scale energy storage can bring to the electricity system when trying to integrate large amounts of wind energy. Energy storage is currently a topical subject in Ireland as wind penetration increases and problems such as curtailment loom. This thesis outlines the storage capacities required to sufficiently aid the integration of wind energy in Ireland and outlines the value that large scale energy storage can bring to …


Gate 3 Grid Connection Group Processing Approach:An Analysis, John Leahy May 2010

Gate 3 Grid Connection Group Processing Approach:An Analysis, John Leahy

Msc. in Energy Management

The aim of this project is to analyse the Group Processing Approach (the “GPA”) to renewable generator grid connections, and in particular the Gate 3 process which is the latest round of the GPA that is currently being implemented in the Republic of Ireland, to determine if it is the most effective approach for connecting new renewable generation. Gate 3 is the third series of the GPA for connecting renewable generation to the Irish Electricity grid where applications are processed in groups or batches. The size of the Gate 3 has bee capped at 3,900MW with applicants being selected based …