Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Engineering

Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan Dec 2013

Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan

UNLV Theses, Dissertations, Professional Papers, and Capstones

The United States (U.S.) is facing significant challenges in addressing aging water infrastructure. Most of the drinking water infrastructure is reaching the end of their useful lives. The American Water Works Association (AWWA) estimated that it will cost about $1 trillion to repair or replace drinking water pipes. Over the next 20 years, it will cost about $298 billion to fix or expand pipes of the nation's wastewater and storm-water systems (AWWA, 2012). Owners, engineers, and contractors are using Alternative Project Delivery (APD) methods - e.g., Design-Build Construction Management-at-Risk Construction Management/General Contractor- to build water and wastewater projects in order …


Performance Comparison Of Design-Build And Construction Manager/General Contractor Highway Projects, Binita Shakya Dec 2013

Performance Comparison Of Design-Build And Construction Manager/General Contractor Highway Projects, Binita Shakya

UNLV Theses, Dissertations, Professional Papers, and Capstones

Researchers have conducted numerous studies comparing project performance of design-bid-build (DBB) and design-build (DB) highway projects. However, little research has been done to compare the performance of DB and construction manager/general contractor (CM/GC) highway projects. Therefore, an exploratory study was conducted to compare the performance of 55 DB and 34 CM/GC highway projects from various States Departments of Transportation (DOTs) in terms of cost, change orders, and construction intensity. The results showed that contract award cost growth was significantly lower in DB projects than in CM/GC projects. In contrast to this, the total cost growth of DB projects was higher …


A Comparative Study Of Performance, Impediments, Advantages, And Disadvantages Of Construction And Professional Disadvantaged Business Enterprises, Ravi Sharma Dec 2013

A Comparative Study Of Performance, Impediments, Advantages, And Disadvantages Of Construction And Professional Disadvantaged Business Enterprises, Ravi Sharma

UNLV Theses, Dissertations, Professional Papers, and Capstones

Construction and professional disadvantaged, minority, and women business enterprises (DBE/MBE/WBEs) face several impediments that hinder their business growth. A questionnaire survey was conducted to determine the important factors that affect their business performance, impediments faced by these business enterprises, advantages, and disadvantages of being DBE (DBE will be an umbrella designation for DBE, MBE, and WBE). This study compares the difference in responses from these two groups. A total of 333 business enterprises responded to the questionnaire. The survey results showed that construction firms gave significantly higher importance to "financial" issues and "safe work practices" as their most important factors …