Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

Butte

Series

Articles 1 - 4 of 4

Full-Text Articles in Engineering

Butte Reclamation Evaluation System Field Manual, Pioneer Technical Services, Inc. Jul 2021

Butte Reclamation Evaluation System Field Manual, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 Final Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp) Revision 3. February 2021, Pioneer Technical Services, Inc. Feb 2021

2021 Final Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp) Revision 3. February 2021, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc. Jan 2021

Revised Draft Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Naming A Mountain Peak - Montana Tech Peak, Jon Craig, Larissa Watson Apr 2013

Naming A Mountain Peak - Montana Tech Peak, Jon Craig, Larissa Watson

Posters

While conducting research to measure and confirm the elevation of Silver Bow County's highest point, Table Mountain, a group of Montana Tech students came across a heretofore unnamed peak designated as Peak 10131 (which denotes it's height).